POWER VERSION
Daisy Power install Document 10/4/22
1. Decide what end you want the Daisy Power control housing and tube motor. To mount the tube motor in the
tube: On the roller end you want the control housing and tube motor, wrap the paper template around roller tube.
Note the arrows indicating the end of the tube and the arrows that match together when the template is around the
tube. This will ensure the template is square for correct tube motor installation
2.
Without the drive motor inside the tube, mark, and drill 6 x 4.5mm holes through the template with the 4.5mm
drill bit (there are 3 holes to be drilled around the tube 8mm in from the end of the tube and a further 3 holes to be
drilled around the tube approximately 285mm from end of tube)
3.
Insert the drive motor into the tube, making sure the drive motor is pushed all the way in so the disengage system
works correctly. If there is a feather plug in way, remove, cut the tip of the feather plug off (so it does not hit the
tube motor), then replace after motor install, then using the 4.5mm drill again, drill through the 6 holes in the tube,
through the drive motor flange. Note: drive motor may have holes already in flange, ensure these holes are not near
the mounting holes
4.
Insert and tighten the 6 x mounting screws. Important: make sure screws around end of tube do not interfere with
tube motor (don’t touch tube motor) – check by disengaging drive to freewheel (pulling pin out – see To Disengage
Drive in operation section)
1.
Decide what end you want the Daisy Power, frame, control
housing and tube motor. To mount the tube motor in the tube:
On the roller end you want the control housing and tube motor,
wrap the paper template around roller tube. Note the arrows
indicating the end of the tube and the arrows that match
together when the template is around the tube. This will ensure
the template is square for correct tube motor installation.
Daisy Power install Document 10/4/22
1. Decide what end you want the Daisy Power control housing and tube motor. To mount the tube motor in the
tube: On the roller end you want the control housing and tube motor, wrap the paper template around roller tube.
Note the arrows indicating the end of the tube and the arrows that match together when the template is around the
tube. This will ensure the template is square for correct tube motor installation
2.
Without the drive motor inside the tube, mark, and drill 6 x 4.5mm holes through the template with the 4.5mm
drill bit (there are 3 holes to be drilled around the tube 8mm in from the end of the tube and a further 3 holes to be
drilled around the tube approximately 285mm from end of tube)
3.
Insert the drive motor into the tube, making sure the drive motor is pushed all the way in so the disengage system
works correctly. If there is a feather plug in way, remove, cut the tip of the feather plug off (so it does not hit the
tube motor), then replace after motor install, then using the 4.5mm drill again, drill through the 6 holes in the tube,
through the drive motor flange. Note: drive motor may have holes already in flange, ensure these holes are not near
the mounting holes
4.
Insert and tighten the 6 x mounting screws. Important: make sure screws around end of tube do not interfere with
tube motor (don’t touch tube motor) – check by disengaging drive to freewheel (pulling pin out – see To Disengage
Drive in operation section)
2.
Without
the drive motor inside the tube, mark and drill 6x
4.5mm holes through the template with the 4.5mm drill bit
(there are 3 holes to be drilled around the tube 8mm in from
the end of the tube and a further 3 holes to be drilled around
the tube approximately 285mm from end of tube).
Daisy Power install Document 10/4/22
1. Decide what end you want the Daisy Power control housing and tube motor. To mount the tube motor in the
tube: On the roller end you want the control housing and tube motor, wrap the paper template around roller tube.
Note the arrows indicating the end of the tube and the arrows that match together when the template is around the
tube. This will ensure the template is square for correct tube motor installation
2.
Without the drive motor inside the tube, mark, and drill 6 x 4.5mm holes through the template with the 4.5mm
drill bit (there are 3 holes to be drilled around the tube 8mm in from the end of the tube and a further 3 holes to be
drilled around the tube approximately 285mm from end of tube)
3.
Insert the drive motor into the tube, making sure the drive motor is pushed all the way in so the disengage system
works correctly. If there is a feather plug in way, remove, cut the tip of the feather plug off (so it does not hit the
tube motor), then replace after motor install, then using the 4.5mm drill again, drill through the 6 holes in the tube,
through the drive motor flange. Note: drive motor may have holes already in flange, ensure these holes are not near
the mounting holes
4.
Insert and tighten the 6 x mounting screws. Important: make sure screws around end of tube do not interfere with
tube motor (don’t touch tube motor) – check by disengaging drive to freewheel (pulling pin out – see To Disengage
Drive in operation section)
Insert and tighten the 6x mounting screws. Important: make
sure screws around end of tube do not interfere with tube
motor (don’t touch tube motor) – check by disengaging drive
to freewheel (pulling pin out – see To Disengage Drive in
operation section).
4.
5.
Ensure drive motor wire is running through the recess in the
housing on the drive motor end, be careful not to pinch wire
when mounting.
3.
Insert the drive motor into the tube, making sure the drive
motor is pushed all the way in so the disengage system
works correctly. If there is a feather plug in the way, remove
it, cut the tip of the feather plug off (so it does not hit the
tube motor), then replace after motor install. Using the
4.5mm drill again, drill through the 6 holes in the tube,
through the drive motor flange.
Note:
Drive motor may have holes already in flange, ensure
these holes are not near the mounting holes.
Expert Tip:
Use power accessory box under planks for
clearance on frame PV hoop.