Test Procedure
If there are any issues with the operation or the unit is unresponsive,
before a service call can be requested (to be completed by end
user), plug in and turn on AC charger continually for a minimum of 3
days (note keep all 240V cords and charger protected from weather
and further than 4m away from pool water).
AC charger is normally warm when working. If Daisy Power unit is
non-responsive, do the following checks:
Is the unit responsive? ie. Is there any partial movement, humming,
clicks – or any response at all?
What is the light display?
Note:
•
If AC charger is NOT plugged in, lights will stay illuminated for
approximately 1 minute after any button press, then turn off.
•
If AC charger IS plugged in, lights will stay on all the time (see
Indicator lights image on this page).
After fully recharging (for a minimum of 3 days) to report any fault,
record what is happening when you test operation (press button)
now?
•
AC charger when plugged in will operate from the AC charger
through PCB at full power.
Is the unit responsive at all with both remote control AND buttons on
the control housing in both or any direction...any partial movement,
humming, clicks or any response?
Is there any change from before charging?
Is the Tube Motor wire plugged in correctly or is there any damage to
the tube motor wire?
Note:
For units behaving strangely: to re-boot system unplug the
tube motor plug.
•
Leave tube motor wire unplugged as this isolates the battery, wait
2 minutes then re plug in tube motor to check operation. What is
the result?
Check correct connection of AC and PV wires into the control
housing. If AC and PV wires are reversed no charging will happen.
OPERATION
Tube
Motor
AC
Charger
PV
Panel
Indicator lights