Daikin VRV III RXYQ-PY1K Скачать руководство пользователя страница 27

RXYQ8~1 RXYQ8~12P7YLK
VRVIII System air conditioner
4PW41760-1

Installation manual

24

12. B

EFORE

 

OPERATION

12.1.

Service precautions

Pay attention to the fan. It is dangerous to inspect the unit while the
fan is running. Be sure to turn off the main switch and to remove the
fuses from the control circuit located in the outdoor unit.

12.2. Checks before initial start-up

After the installation, check the following before switching on the
circuit breaker:

1

The position of the switches that require an initial setting

Make sure that switches are set according to your application
needs before turning the power supply on.

2

Power supply wiring and transmission wiring

Use a designated power supply and transmission wiring and
make sure that it has been carried out according to the
instructions described in this manual, according to the wiring
diagrams and according to local and national regulations.

3

Pipe sizes and pipe insulation

Make sure that correct pipe sizes are installed and that the
insulation work is properly executed.

4

Air tight test and vacuum drying

Make sure the air tight test and vacuum drying were completed.

5

Additional refrigerant charge

The amount of refrigerant to be added to the unit should be
written on the included "Added Refrigerant" plate and attached
to the rear side of the front cover.

6

Insulation test of the main power circuit

Using a megatester for 500 

V, check that the insulation

resistance of 2 M

 or more is attained by applying a voltage of

500 V DC between power terminals and earth. Never use the
megatester for the transmission wiring.

7

Installation date and field setting

Be sure to keep record of the installation date on the sticker on
the rear of the upper front panel according to EN60335-2-40.
and keep record of the contents of the field setting.

12.3. Field setting

If required, carry out field settings according to the following
instructions. Refer to the service manual for more details.

Opening the switch box and handling the switches

When carrying out field settings, remove
the inspection cover (1).

Operate the switches with an insulated
stick (such as a ball-point pen) to avoid
touching live parts.

Make sure to re-attach the inspection cover (1) into the switch box
cover (2) after the job is finished.

WARNING: ELECTRIC SHOCK 

Caution when performing service to inverter
equipment

1

Do not open the electric box cover for 10 minutes after
the power supply is turned off.

2

Measure the voltage between terminals on the
terminal block for power supply with a tester and
confirm that the power supply is shut off.

In addition, measure the points, as shown in the figure
below, with a tester and confirm that the voltage of the
capacitor in the main circuit is less than 50 V DC.

3

To  prevent damaging the PC-board, touch a
noncoated metal part to eliminate static electricity
before pulling out or plugging in connectors.

4

The performing of the service to the inverter
equipment must be started after the junction
connectors X1A, X2A, X3A, X4A (X3A and X4A are
for 14~18 unit type only) for the fan motors in the
outdoor unit are been pulled out. Be carefull not to
touch the live parts.

(If a fan rotates due to strong wind, it may store
electricity in the capacitor or in the main circuit and
cause electric shock.)

5

After the service is finished, plug the junction
connecter back in. Otherwise the error code 

E7

 will be

displayed on the remote controller and normal
operation will not be performed.

For details refer to the wiring diagram labeled on the back
of the electric box cover.

NOTE

Play it safe!

For protection of the PCB, touch the switch box casing
by hand in order to eliminate static electricity from your
body before performing service.

A2P

A2P

A1P

A3P

TP1 TP2

NOTE

Remark that during the first running period of the unit,
required power input may be higher than stated on the
nameplate of the unit. This phenomenon originates
from the compressor that needs elapse of a 50 hours
run in period before reaching smooth operation and
stable power consumption.

Make sure that the circuit breaker on the power supply
panel of the installation is switched off.

Attach the power wire securely.

Introducing power with a missing N-phase or with a
mistaken N-phase will break the equipment.

NOTE

Make sure that all outside panels, except for the panel
on the electric box, are closed while working.

Close the lid of the electric box firmly before turning on
the power.

2

1

Содержание VRV III RXYQ-PY1K

Страница 1: ...INSTALLATION MANUAL RXYQ8P7Y1K RXYQ10P7Y1K RXYQ12P7Y1K RXYQ8P7YLK RXYQ10P7YLK RXYQ12P7YLK System air conditioner...

Страница 2: ...XYQ16 32 2 1 h1 h2 a 10 mm b 300 mm c 10 mm d 500 mm a 50 mm b 100 mm c 50 mm d 500 mm a 200 mm b 300 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm a 200 mm b...

Страница 3: ...OUT D UNIT TO MULTI UNIT A1P 3 A B C F1 F2 F1 F2 Q1 Q2 Q1 Q2 A1P 4 4 5 6 2 1 3 Q1 Q2 7 5 3 4 1 6 6 2 2 TO IN D UNIT F1 F2 DS1 1 2 3 4 OFF ON O U T I N F1 F2 P1 P2 P1 P2 1 A B C A B C 1 DS1 1 2 3 4 OF...

Страница 4: ...for their installation 1 1 Combination The indoor units can be installed in the following range Always use appropriate indoor units compatible with R410A To learn which models of indoor units are com...

Страница 5: ...5 35 RXYQ24 RXYQ12 RXYQ12 300 780 39 RXYQ26 RXYQ8 RXYQ8 RXYQ10 325 845 42 RXYQ28 RXYQ8 RXYQ10 RXYQ10 350 910 45 RXYQ30 RXYQ8 RXYQ10 RXYQ12 375 975 48 RXYQ32 RXYQ10 RXYQ10 RXYQ12 400 1040 52 RXYQ34 RXY...

Страница 6: ...easures in order to prevent that the outdoor unit be used as a shelter by small animals Small animals making contact with electrical parts can cause malfunctions smoke or fire Please instruct the cust...

Страница 7: ...G 1 Packaging material 2 Opening large 3 Belt sling 4 Opening small 40x45 5 Protector NOTE Use a belt sling of 20 mm wide that adequately bears the weight of the unit NOTE Use filler cloth on the fork...

Страница 8: ...size is not available stick to the original pipe diameter which may result in a small capacity decrease 6 3 Pipe connection Be sure to perform a nitrogen blow when brazing and to read the paragraph C...

Страница 9: ...on into the piping side Pattern 1 Pattern 2 Prohibited patterns change to pattern 1 or 2 1 Pinched piping 2 Stop valve 3 Service port 4 Point of melting the brazing metal Precautions when connecting f...

Страница 10: ...e than 500 mm of straight section can be ensured Improper installation may lead to malfunction of the outdoor unit 6 Piping length restrictions Make sure to perform the piping installation within the...

Страница 11: ...be used with R410A How to select the refnet joint When using refnet joints at the first branch counted from the outdoor unit side Choose from the following table in accordance with the capacity of the...

Страница 12: ...es must be doubled except main pipe and the pipes that not increase the pipe size a b 2 c 2 d 2 e 2 f 2 g 2 h i j k l m n p 1000 m Indoor unit to the nearest branch kit 40 m h i j p 40 m The differenc...

Страница 13: ...side stop valve Gas side stop valve Performing the airtightness test and vacuum drying Valve A must always be shut Otherwise the refrigerant in the unit will pour out Close Open Open Close Close NOTE...

Страница 14: ...stor current limiting S1NPH Pressure sensor high S1NPL Pressure sensor low S1PH S2PH Pressure switch high T1A Current sensor A6P A7P SD1 Safety devices input V1R Power module A3P A4P A8P V2R Diode bri...

Страница 15: ...prevent malfunctioning of the earth leakage breaker itself Earth leakage breakers that are especially designed for protecting ground faults must be used in conjunction with main switch and fuse for us...

Страница 16: ...akage breaker 4 Outdoor unit 5 Indoor unit 6 Remote controller Power supply wiring sheathed cable outdoor 3 phase 380 415 V indoor 1 phase 230 V Transmission wiring sheathed cable 16 V 1 Electric wiri...

Страница 17: ...16 branches are possible for unit to unit cabling No branching is allowed after branching See figure 16 Never connect the power supply to transmission wiring terminal block Otherwise the entire system...

Страница 18: ...ying power wiring Do not connect wiring of different thicknesses to the power terminal block Slack in the power wiring may cause abnormal heat When connecting wiring which is the same thickness do as...

Страница 19: ...ansmission wiring between outdoor and indoor unit outdoor and COOL HEAT selector etc 11 CHARGING REFRIGERANT The outdoor unit is factory charged but depending on the length of the piping when installe...

Страница 20: ...d line stop valve 9 5 a a The model RXYQ12 supports field piping of 12 7 on the accessory pipe supplied with the unit Gas line stop valve 19 1 25 4 b b The model RXYQ10 supports field piping of 22 2 o...

Страница 21: ...r the power is on via the service lid which is in the lid of the electric box Operate switches with an insulated stick such as a ball point pen to avoid touching the life parts Make sure to re attach...

Страница 22: ...tton once if the LEDs combination is not as in the figure below 3 Press the button once 4 Hold the button down for 5 seconds or more 5 Charging mode judgement For automatic charging the charging must...

Страница 23: ...d check the LEDs and check if the P9 code is displayed on the remote controller When the charging amount is little the PE code may not be displayed but instead the P9 code will be displayed immediatel...

Страница 24: ...mode is not possible in some cases The unit will automatically select the cooling mode or heating mode for charging Continue with the manually charging in cooling mode OR in heating mode Charging in...

Страница 25: ...e controller malfunction code display on page 22 H1P H2P H3P H4P H5P H6P H7P w c c w w w w BS4 TEST BS4 TEST BS1 MODE LED display Default status before delivery Micro computer operation monitor Mode R...

Страница 26: ...form the overcharge judgement procedure again When there is no more overcharging of refrigerant detected restart the automatic refrigerant charging from 1 Start of automatic charging refrigerant as ex...

Страница 27: ...uch as a ball point pen to avoid touching live parts Make sure to re attach the inspection cover 1 into the switch box cover 2 after the job is finished WARNING ELECTRIC SHOCK Caution when performing...

Страница 28: ...selection on page 13 not installed factory setting 2 4 NOT USED DO NOT CHANGE THE FACTORY SETTING What to set with dip switch DS2 1 4 NOT USED DO NOT CHANGE THE FACTORY SETTING What to set with dip s...

Страница 29: ...he external control adapter F power consumption limitation setting via the external control adapter G enabling function of the low noise operation level setting and or power consumption limitation set...

Страница 30: ...pleted Normal operation will be possible after 5 minutes If a malfunction code is displayed on the remote controller correct the malfunction and perform the check operation again as decribed in Correc...

Страница 31: ...tion will be prohibited 2 Cut off the power supply to the indoor units and the outdoor unit with the circuit breaker After the power supply to one side is cut off cut off the power supply to the other...

Страница 32: ...such as the following calculate the volume of A B as a single room or as the smallest room 3 Calculating the refrigerant density using the results of the calculations in steps 1 and 2 above If the re...

Страница 33: ...5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 28 13 6 9 8 1 2 4 3 5 14 15 16 12 11 10 10 7 29 13 14 3 5 4 2 1 7 8 9 6 10 10 11 10 2 2 12 9 9 30 13 14 3 5 4 2 1 7 8 9 6...

Страница 34: ...4PW41760 1 Copyright Daikin...

Отзывы: