PIM-00004
△
1
[Operation Manual]
46/61
DAIKIN INDUSTRIES, LTD.
Oil cooler maintenance procedure
WARNING
[1] Before maintenance work, stop operation, and turn OFF the main power supply.
[2] During work, wear protective goggles and gloves.
i) The core fin has a sharp edge. Be careful not to hurt yourself.
ii) During air blow, be careful that foreign bodies will not touch your eyes.
CAUTION
[1] Be careful that strong force will not be applied to the AC fan power supply cable and connector during
work.
[2] During disassembly process, oil will flow out of the pipes and oil cooler.
1. Dismounting the oil cooler
[1] Loosen the cross recessed truss head machine screws (M5 L14, two pieces) in the full cover, and remove
the full cover.
The full cover has been fastened to the unit body with the claws (at six places in total: two at the front
of the unit, one on each side, and two at the top of the unit). Lift the cover vertically from the unit.
[2] Open the controller small cover, and remove the fan
connector and the fan ground cable.
[3] Cut the binding strap that ties the fan harness.
[4] Cut the binding strap that ties the hoses.
[5] Remove the hose bands (at two places), and disconnect the
hoses (two pieces) at the top of the oil cooler.
Note) In this step, oil may leak due to backward oil flow
from the tank. Before conducting this step, attach a
blind plug to each hose.
[6] Remove the hexagon socket head bolts (M5 L16: 2 pieces)
with washers, and dismount the oil cooler.
Fan connector
Fan ground cable
<When the controller small cover is removed>