3
|
Components
Service manual
71
RXQ25+3 3 3
35AMV1B
Split Sensira R32 BBOP
ESIE21-16 – 2022.02
7
After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
a
b
c
a
a
Putty
b
Expansion valve pipe
c
Expansion valve body
INFORMATION
The expansion valve and coil can have a different configuration / layout.
8
Reinstall the putty.
9
To install the expansion valve coil, see
10
Perform a pressure test, see
120].
11
Add
refrigerant
to
the
refrigerant
circuit,
see
124].
To install the expansion valve coil
1
Install the expansion valve coil on the expansion valve body.
INFORMATION
Turn the expansion valve coil 1/8 turn clockwise to lock it on the expansion valve
body.
INFORMATION
The correct alignment of the expansion valve coil is ensured by dimples.
b
a
a
Expansion valve coil
b
Pipe
2
Route the expansion valve coil harness towards the appropriate PCB.
3
Connect the expansion valve coil connector to the appropriate PCB.