background image

Lo

w V

oltage 

2006/95/EC

Electromagnetic Compatibility 2004/108/EC

*

DAIKIN.TCF.015 N3/10-2010

KEMA Quality B.V.

74736-KRQ/EMC97-4957

Umeda Center Bldg., 2-4-12, Nakazaki-Nishi,

Kita-ku, Osaka, 530-8323 Japan 

D

AIKIN INDUSTRIES,

 L

T

D

.

,            ,

3SB64417-12H

RXL20G3V1B, RXL25G3V1B, RXL35G3V1B

Shinri Sada

Manager Quality Control Department

3SB64417-12H.fm  Page 1  Wednesday, September 29, 2010  5:03 PM

Содержание RXL25G3V1B

Страница 1: ...ON MANUAL Installation manual Installationsmanual Installationshandbok Installasjonsh ndbok Asennusohje Installierungshandbuch Manuel d installation Instrukcja montazu Installatiehandleiding R410A Spl...

Страница 2: ...2010 KEMA Quality B V 74736 KRQ EMC97 4957 Umeda Center Bldg 2 4 12 Nakazaki Nishi Kita ku Osaka 530 8323 Japan DAIKIN INDUSTRIES LTD 3SB64417 12H RXL20G3V1B RXL25G3V1B RXL35G3V1B Shinri Sada Manager...

Страница 3: ...ntrol box lid may result in electric shocks fire or over heating terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant come...

Страница 4: ...are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since dra...

Страница 5: ...unit to install Tighten the screws Stop valve cover O D 9 5mm Gas pipe Liquid pipe O D 6 4mm 20g m 15m 20m Max allowable length Max allowable height Additional refrigerant required for refrigerant pip...

Страница 6: ...of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts until their length are 20mm...

Страница 7: ...the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches Cut...

Страница 8: ...valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and...

Страница 9: ...insulation O D 9 5mm O D 6 4mm I D 12 15mm I D 8 10mm Minimum bend radius Thickness 10mm Min 30mm or more Thickness 0 8mm C1220T O Filling a cylinder with an attached siphon Stand the cylinder uprigh...

Страница 10: ...s the indoor unit operation stop button Using the main unit s remote controller 1 Press the operation stop button Operation will start 2 Press the temperature button and the operation select button at...

Страница 11: ...e heat exchanger of the unit is exposed to direct wind provide a windbreak wall 2 Intermittent noises may be produced by the indoor unit due to the outdoor fan turning on and off when using facility s...

Страница 12: ...ring to the power supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used due...

Страница 13: ...in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off t...

Страница 14: ...1010 HT 3P232550 11C M10B236 Two dimensional bar code is a code for manufacturing 00_CV_3P232550 11C fm Page 2 Thursday September 16 2010 11 38 AM...