Special Control
SiUS39-602
52
Function
3.3
Defrosting Operation
In order to melt the frost accumulated on the heat exchanger during heating operation,
Defrost operation is performed to restore the heating capacity.
[Starting conditions]
Start defrosting operation referring to the following conditions.
* Heat conductivity of outdoor heat exchangers
* Heat exchange temperature (Tb)
* Timer (Min. 2 hours)
The heat conductivity of outdoor heat exchangers is calculated based on Tc, Te, and
compressor load.
<Defrost starting condition>
Defrost operation is started when the outdoor heat exchanger temperature becomes lower than deicer temperature.
Defrost operation is conducted once in max. 2 hours.
Actuator
Defrost preparation
operation
Defrost operation
Post-defrost operation
Compressor
Upper limit control
143 Hz + ON
1-step increase from
(74Hz + OFF) to
(Pc - Pe > 0.4 MPa)
Outdoor unit fan
STEP7
or
STEP8
OFF
STEP8
Four way valve 1
Depend on previous heat
exchange mode
OFF
ON
Four way valve 2
Depend on previous heat
exchange mode
OFF
OFF
Main motorized valve (EV1)
Four way valve 1
OFF:1400 pls
ON:SH control
1400 pls
180 pls
Sub motorized valve (EV2)
Four way valve 2
OFF:1400 pls
ON:SH control
1400 pls
1400 pls
Sub-cooling motorized valve (EV3)
0 pls
0 pls
0 pls
Hot gas bypass valve (SVP)
OFF
ON
ON
Oil equalization valve (SVO)
ON
ON
ON
Receiver gas charging valve (SVL)
OFF
OFF
OFF
Receiver gas discharge valve (SVG)
OFF
OFF
OFF
Discharging pipe stop valve (SVR)
ON
OFF
OFF
Non-operating unit liquid pipe stop
valve (SVSL)
ON
OFF
OFF
High pressure gas pipe pressure
reduction valve (SVC)
OFF
ON
ON
Ending conditions
2 min.
•
12 min.
•
Tb > 52
°
F
•
160 sec.
•
Pc - Pe>58 psi
or
or
Indoor unit actuator
During defrost
Fan
Cooling Thermostat ON unit
Set Fan Speed
Heating Thermostat ON unit
OFF
Stopping unit
OFF
Cooling Thermostat OFF unit
Set Fan Speed
Heating Thermostat OFF unit
OFF
Electronic expansion valve
Thermostat ON unit
512 pls
Stopping unit
512 pls
Thermostat OFF unit
512 pls
Содержание REYQ72
Страница 35: ...Specifications SiUS39 602 24 Specifications...
Страница 121: ...Field Setting SiUS39 602 110 Test Operation...
Страница 129: ...Troubleshooting by Remote Controller SiUS39 602 118 Troubleshooting...
Страница 225: ...Troubleshooting OP Unified ON OFF Controller SiUS39 602 214 Troubleshooting...
Страница 229: ...Piping Diagrams SiUS39 602 218 Appendix 1 Piping Diagrams 1 1 Outdoor Unit REYQ72M 96MTJU 4D045329A...
Страница 232: ...SiUS39 602 Piping Diagrams Appendix 221 1 3 BS Unit BSVQ36MVJU BSVQ60MVJU 4D045338...
Страница 234: ...SiUS39 602 Wiring Diagrams for Reference Appendix 223 2 2 Field Wiring REYQ72 96MTJU C 3D050361A...
Страница 235: ...Wiring Diagrams for Reference SiUS39 602 224 Appendix REYQ144 168 192MTJU C 3D050354A...
Страница 238: ...SiUS39 602 Wiring Diagrams for Reference Appendix 227 FXAQ07M 09M 12M 18M 24MVJU FXHQ12M 24M 36M 3D046039C 3D048116...
Страница 239: ...Wiring Diagrams for Reference SiUS39 602 228 Appendix FXLQ12M 18M 24MVJU FXNQ12M 18M 24MVJU 3D045644A...
Страница 240: ...SiUS39 602 Wiring Diagrams for Reference Appendix 229 2 4 BS Unit BSVQ36M 60MVJU 3D045069A...
Страница 249: ...Example of Connection R 410A Type SiUS39 602 238 Appendix...
Страница 255: ...Method of Replacing The Inverter s Power Transistors and Diode Modules SiUS39 602 244 Appendix...
Страница 265: ...Precautions for New Refrigerant R 410A SiUS39 602 254 Precautions for New Refrigerant R 410A...
Страница 269: ...SiUS39 602 iv Index...