4
Set-up and installation
Installation and operating instructions
27
Gas Combi Unit
Floor-standing gas condensing boiler with integrated heat storage
008.1543899_02 – 04/2019 – EN
4.6.1
Aligning the connections of the heating
inflow and return flow
The connections of the heating supply and return can be directed
upwards or backwards in order to adapt it optimally to the structural
conditions of the installation site.
The device is supplied with upwards aligned connections as
standard.
For this type of connection, the cover hood must be cut
out in the area of the heating lines.
Fig. 4-19
Cut-out for heating lines
The following conversion steps are required in order to direct
the connections to the rear out of the device
:
1
Remove the protective cover and top thermal insulation
(see
).
Fig. 4-20
Aligning the heating inflow and return flow upwards
2
Pull the two securing clips off the connection couplings
(
3
Pull off the two connection couplings (
, item B).
CAUTION
When working on the hydraulics, pay attention to the in-
stallation position of the O-rings to avoid damaging them
and causing leaks.
▪ Always place O-rings on the part to be inserted after dis-
assembly or before assembly (see
).
▪ The heating lines must be connected free of tension via
the plug connectors. Establish a suitable strain relief es-
pecially when connecting with flexible lines (not open to
diffusion!) (see
).
Fig. 4-21
Hydraulic system plug connectors
4
5
Pull off the sealing plug securing clip (
, item D).
6
7
8
Содержание GCU compact Series
Страница 2: ......