SiBE01-503
Indoor Unit
Removal Procedure
79
For restoring.
1. Since the key pattern hook
is provided on the left side,
insert the edge of the blade
to the tip while rotating it.
2. Restore the two fixed parts
of the horizontal blade onto
the hook.
2. Remove the
vertical blades
.
1
Disengage the vertical
blade’s joint from the
fixed plate.
2
Remove the blade
forward.
Five vertical blades are
integrated with the joint rod.
(so, only one blade can’t be
exchanged.)
Step
Procedure
Points
Содержание FTYN25DV3B ATY20DV2
Страница 1: ...SiBE01 503 SPLIT Pair D Series Applied Models zNon Inverter Pair Heat Pump...
Страница 5: ...SiBE01 503 iv Table of Contents Index i Drawings Flow Charts iii...
Страница 10: ...SiBE01 503 List of Function 1 Part 1 List of Function 1 Functions 2...
Страница 13: ...Functions SiBE01 503 4 List of Function...
Страница 14: ...SiBE01 503 Specifications 5 Part 2 Specifications 1 Specifications 6...
Страница 21: ...Printed Circuit Board Connector Wiring Diagram SiBE01 503 12 Printed Circuit Board Connector Wiring Diagram...
Страница 35: ...Control Specification SiBE01 503 26 Functions and Control...
Страница 59: ...Instructions SiBE01 503 50 System Configuration...
Страница 79: ...Check SiBE01 503 70 Service Diagnosis...
Страница 117: ...Others SiBE01 503 108 Others...