![Daikin FTY25GXV1 Скачать руководство пользователя страница 89](http://html.mh-extra.com/html/daikin/fty25gxv1/fty25gxv1_service-manual_2459572089.webp)
Indoor Unit
SiBE01-829
78
Removal Procedure
3
Widen the auxiliary
piping to the extent of
10°~20°.
At an angle of 10°~20°
4
Unscrew the fixing
screw on the left side.
Caution
When dismounting or
mounting the heat
exchanger, be sure to wear
gloves or wrap it with cloth
before proceeding to the
work. (You may be injured by
the fins.)
5
Push and undo the heat
exchanger fixing hook
on the right side and lift
up the heat exchanger.
6
Pull the
heat exchanger
to the front side and
undo the hooks
completely, and then lift
it.
Step
Procedure
Points
(R8619)
(R8620)
Heat exchanger fixing hook
(R8043)
Heat exchanger
Содержание FTY25GXV1
Страница 1: ...SiBE01 829 Applied Models Non Inverter Pair Heat Pump SPLIT Pair Wall Mounted Type G Series ...
Страница 5: ...SiBE01 829 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 11: ...Introduction SiBE01 829 x ...
Страница 12: ...SiBE01 829 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 15: ...Functions SiBE01 829 4 List of Function ...
Страница 16: ...SiBE01 829 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 19: ...Specifications SiBE01 829 8 Specifications ...
Страница 23: ...Printed Circuit Board Connector Wiring Diagram SiBE01 829 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 49: ...Instructions SiBE01 829 38 Operation Manual ...
Страница 69: ...Check SiBE01 829 58 Service Diagnosis ...
Страница 107: ...Outdoor Unit SiBE01 829 96 Removal Procedure 10 Remove the electrical box Step Procedure Points R8556 ...
Страница 111: ...Outdoor Unit SiBE01 829 100 Removal Procedure ...
Страница 112: ...SiBE01 829 Others 101 Part 8 Others 1 Others 102 1 1 Trial Operation and Testing 102 1 2 Pump Down Operation 102 ...
Страница 119: ...Wiring Diagrams SiBE01 829 108 Appendix ...
Страница 123: ...SiBE01 829 iv Drawings Flow Charts ...