
SiBE01-829
Indoor Unit
Removal Procedure
73
5
Disconnect the wire
harnesses with pliers.
2. Removing the display
PCB
Preparation
Remove the electrical box
according to the “Removal
of Electrical Box”.
1
Lift the lower part of the
display PCB to remove.
2
Disconnect the
connector [CN_MB]
from the display PCB.
3
The figure shows the
names of the display
PCB component parts.
Step
Procedure
Points
(R8606)
(R8607)
ON/OFF switch
TIMER lamp
Signal receiver
[CN_MB]
Operation lamp
(R8608)
Содержание FTY25GXV1
Страница 1: ...SiBE01 829 Applied Models Non Inverter Pair Heat Pump SPLIT Pair Wall Mounted Type G Series ...
Страница 5: ...SiBE01 829 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 11: ...Introduction SiBE01 829 x ...
Страница 12: ...SiBE01 829 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 15: ...Functions SiBE01 829 4 List of Function ...
Страница 16: ...SiBE01 829 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 19: ...Specifications SiBE01 829 8 Specifications ...
Страница 23: ...Printed Circuit Board Connector Wiring Diagram SiBE01 829 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 49: ...Instructions SiBE01 829 38 Operation Manual ...
Страница 69: ...Check SiBE01 829 58 Service Diagnosis ...
Страница 107: ...Outdoor Unit SiBE01 829 96 Removal Procedure 10 Remove the electrical box Step Procedure Points R8556 ...
Страница 111: ...Outdoor Unit SiBE01 829 100 Removal Procedure ...
Страница 112: ...SiBE01 829 Others 101 Part 8 Others 1 Others 102 1 1 Trial Operation and Testing 102 1 2 Pump Down Operation 102 ...
Страница 119: ...Wiring Diagrams SiBE01 829 108 Appendix ...
Страница 123: ...SiBE01 829 iv Drawings Flow Charts ...