
Service Check Function
SiBE01-829
42
Service Diagnosis
3. Service Check Function
The temperature display sections on the main unit indicate corresponding codes.
Check Method
1. When the ON timer or OFF timer cancel button is held down for 5 seconds, a “
00
” indication
flashes on the temperature display section.
2. Press either ON timer or OFF timer cancel button repeatedly until a long beep is produced.
The code indication changes in the sequence shown below, and notifies with a long beep.
Note:
1. A short beep and two consecutive beeps indicate non-corresponding codes.
2. To cancel the code display, hold the ON timer or OFF timer cancel button down for 5
seconds. The code display also cancels itself if the button is not pressed for 1 minute.
No.
Code
No.
Code
No.
Code
1
00
13
C7
25
UA
2
U4
14
A3
26
UH
3
L5
15
H8
27
P4
4
E6
16
H9
28
L3
5
H6
17
C9
29
L4
6
H0
18
C4
30
H7
7
A6
19
C5
31
U2
8
E7
20
J3
32
EA
9
U0
21
J6
33
AH
10
F3
22
E5
34
E8
11
A5
23
A1
35
E3
12
F6
24
E1
36
E4
(R8500)
OFF
ON
PM
AM
ß
C
ß
F
AUTO
P1
P2
MODE
SLEEP
SET
CLR
ON TIMER
CLR
SET
OFF TIMER
TIMER CANCEL button
Содержание FTY25GXV1
Страница 1: ...SiBE01 829 Applied Models Non Inverter Pair Heat Pump SPLIT Pair Wall Mounted Type G Series ...
Страница 5: ...SiBE01 829 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 11: ...Introduction SiBE01 829 x ...
Страница 12: ...SiBE01 829 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 15: ...Functions SiBE01 829 4 List of Function ...
Страница 16: ...SiBE01 829 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 19: ...Specifications SiBE01 829 8 Specifications ...
Страница 23: ...Printed Circuit Board Connector Wiring Diagram SiBE01 829 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 49: ...Instructions SiBE01 829 38 Operation Manual ...
Страница 69: ...Check SiBE01 829 58 Service Diagnosis ...
Страница 107: ...Outdoor Unit SiBE01 829 96 Removal Procedure 10 Remove the electrical box Step Procedure Points R8556 ...
Страница 111: ...Outdoor Unit SiBE01 829 100 Removal Procedure ...
Страница 112: ...SiBE01 829 Others 101 Part 8 Others 1 Others 102 1 1 Trial Operation and Testing 102 1 2 Pump Down Operation 102 ...
Страница 119: ...Wiring Diagrams SiBE01 829 108 Appendix ...
Страница 123: ...SiBE01 829 iv Drawings Flow Charts ...