
System Configuration
SiBE01-829
28
Operation Manual
1. System Configuration
After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
Содержание FTY25GXV1
Страница 1: ...SiBE01 829 Applied Models Non Inverter Pair Heat Pump SPLIT Pair Wall Mounted Type G Series ...
Страница 5: ...SiBE01 829 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 11: ...Introduction SiBE01 829 x ...
Страница 12: ...SiBE01 829 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 15: ...Functions SiBE01 829 4 List of Function ...
Страница 16: ...SiBE01 829 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 19: ...Specifications SiBE01 829 8 Specifications ...
Страница 23: ...Printed Circuit Board Connector Wiring Diagram SiBE01 829 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 49: ...Instructions SiBE01 829 38 Operation Manual ...
Страница 69: ...Check SiBE01 829 58 Service Diagnosis ...
Страница 107: ...Outdoor Unit SiBE01 829 96 Removal Procedure 10 Remove the electrical box Step Procedure Points R8556 ...
Страница 111: ...Outdoor Unit SiBE01 829 100 Removal Procedure ...
Страница 112: ...SiBE01 829 Others 101 Part 8 Others 1 Others 102 1 1 Trial Operation and Testing 102 1 2 Pump Down Operation 102 ...
Страница 119: ...Wiring Diagrams SiBE01 829 108 Appendix ...
Страница 123: ...SiBE01 829 iv Drawings Flow Charts ...