Operation manual
6
FHYBP + FHYCP + FDYP + FBQ + FCQ + FDQ
Split system air conditioners
4PW10622-1E
Start-up after a long stop
■
Confirm the following.
-
Check that the air inlet and outlet are not blocked. Remove
any obstacle.
-
Check if the earth is connected.
-
Is there a broken wire somewhere? Contact your dealer if
there are any problems.
■
Clean the air filter and outside panels.
-
After cleaning the air filter, make sure to attach it.
■
Turn on the main power supply switch.
-
The control panel display lights when the power is turned on.
-
To protect the unit, turn on the main power switch at least
6 hours before operation.
What to do when stopping the system for a long period
■
Turn on FAN OPERATION for a half day and dry the unit.
-
Refer to the manual of the remote controller.
■
Cut off the power supply.
-
When the main power switch is turned on, some wattage is
being consumed even if the system is not operating.
-
The remote controller display will be switched off when the
main power switch is turned off.
■
Clean the air filter and the exterior. Be sure to replace the air
filter to its original place after cleaning. Refer to
"Maintenance"
on page 4
.
Disposal requirements
Dismantling of the unit, treatment of the refrigerant, oil and eventual
other parts, should be done in accordance with the relevant local and
national regulations.
N
OTES
Содержание FHYBP100B7V1
Страница 9: ...NOTES NOTES...
Страница 10: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PWEN10622 1E...