16
English
9. ELECTRIC WIRING WORK
WIRING INSTRUCTIONS
•
Electric wiring work must be conducted by electrician authorized by power companies. (Only licensed
electrician can conduct electric work and earth connections.)
•
All wiring must be performed by an authorized electrician.
•
Be sure to install an earth leakage breaker to the outdoor unit.
(This installation of an earth leakage breaker is mandatory for the prevention of electric shocks and fire
disasters.)
•
Install the earth leakage breaker which can handle harmonics.
(This unit has an inverter, so an interrupter capable of handling high frequencies is needed to prevent
malfunction of the interrupter itself.)
•
Be sure to use earth leakage breaker dedicated for earth leakage protection in combination with the load
break switch with fuse or breaker for wiring.
•
Make sure that 230V is specified wiring between the indoor and outdoor units and between indoor units.
•
Do not turn on the power supply (of the indoor unit) until all the installation work is completed.
•
Be sure to earth the air conditioner.
•
Do not connect the earth wire to gas pipes, plumbing pipes, lightning rods, or telephone earth wires.
•
Gas pipes: might cause explosions or fire if gas leaks.
•
Plumbing: no earth effect if hard vinyl piping is used.
•
Telephone earth wires or lightning rods: might cause abnormally high electric potential in the earth
during lighting storms.
•
The earth is needed in order to reduce the noise generated by the unit’s inverter and influence on other
appliances and to release the charge built up in the product box by leaked current.
•
For electric wiring work, refer to also “WIRING DIAGRAM” attached to the unit body.
•
Never connect the power supply wire to the terminal block for remote controller wire, or otherwise the entire
system may be damaged.
•
For remote controller wiring details, refer to the installation manual attached to the remote controller.
•
Do not touch the printed circuit board ASSY during the wiring work. Otherwise, it may cause damage.
10. WIRING EXAMPLE AND HOW TO SET THE REMOTE CONTROLLER
10-1 Connection of wiring between units, earth wire and for the remote controller cord
(Remove the control box lid as shown below and connect each wire.)
(1) Remove the control box lid.
Screw
(3 portions)
01_EN_3PN06583-10W.fm Page 15
Thursday, March 24, 2011 9:03 AM
Содержание FBQ20EAVAK
Страница 30: ...MEMO...
Страница 31: ...FBQ20EAVAK FBQ24EAVAK FBQ36EAVAK FBQ45EAVAK FBQ48EAVAK FBQ48EAVMK...
Страница 32: ......
Страница 33: ...R410A SUNISO R410A R410A R407C R410A R410A...
Страница 34: ...R410A M5 16 24 20 48 45 36 M4 8...
Страница 35: ...BRC1E62 BRC1D61 BRC1C61 BRC4C62 BRC4C64 FBQ48EAVMK BRC4C62...
Страница 36: ......
Страница 37: ...A 1 A 2...
Страница 38: ...M10 A 1 A 2 B D B C D 24 20 48 45 36...
Страница 39: ......
Страница 40: ...C RH C R410A R410A...
Страница 41: ...A...
Страница 42: ......
Страница 43: ...BCuP 2 JIS Z 3264 B Cu93P 710 795 ISO 3677...
Страница 44: ......
Страница 45: ......
Страница 46: ...ASSY...
Страница 47: ...X2M...
Страница 48: ...X1M X2M...
Страница 49: ......
Страница 50: ...36 24 20 48 45 FBQ48EAVMK...
Страница 51: ...P1 P2 2 P 1 P 2 P 1 P...
Страница 52: ...S M P1 P2...
Страница 53: ...L H...
Страница 54: ...Daikin LCD...
Страница 55: ......
Страница 56: ...A1 A3 A6 A8 AF AH AJ C1 C4 C6 C9 CC CJ E0 E1...
Страница 57: ...E3 E4 E5 E7 E9 F3 H3 H7 H9 J1 J2 J3 J5 J6 J7 J8 J9 JA JC L1 L4 L5 L8 L9 LC P1 P3 P4 PJ U0 U1 L3 L2 L1 U2...
Страница 58: ...U4 UF UF U5 U8 UA UC UJ...
Страница 59: ......
Страница 91: ...English 30 MEMO...
Страница 92: ...31 English MEMO...
Страница 93: ...R410A R410A SUNISO R410A R410A RZQ45LCVAK RZQ20LCVAK RZQ45MUYLK RZQ24LCVAK RZQ48MUYLK RZQ36LCVAK RZR48MUYMK...
Страница 94: ...2 1...
Страница 95: ...3 1 1 1 2 3 4 5 R410A SUNISO R410A R410A 33 3 3 R407C 40 4 0 R410A R410A...
Страница 96: ...4 2 1 2 48 2 2 1 1 2 1 2 3 1 3 3 71 PP 2 1...
Страница 97: ...5 3 1 4 6 3 2 5 5 4 1 1 1 5 1 5...
Страница 98: ...6 R410A 3 4 500 500 4 DB C 35 C 35 RZ Q R 48 RZQ20 24 RZ Q R 48 RZQ45 RZQ36 1 4 1 2 3 50 100 100 100 500 100...
Страница 103: ...11 4 2 1 3 1 B 1 2 40 D C 2 2 1 3 1 25 3 A 4 4 A D 5 4 4 4 1 3 2...
Страница 104: ...12 100 M12 6 20 6 1 6 R410A BCuP 11 8 6...
Страница 105: ...13 2 6 3 6 5 6 6 6 5 6 4 6 Suniso R407C R410A R410A 755 0 1...
Страница 107: ...15 10 7 11 16 10 11...
Страница 108: ...16 12 13 6 4 1 2 1 2 14 13 12 16 5 13 5 27 5 22 5...
Страница 109: ...17 15 15 75 C 30 20 80 C 30 C 120 13 9 11 5 14...
Страница 110: ...18 1 4 3 1 1 15 9 5 39 9 32 7 13 2 12 8 15 9 75 4 61 8 19 7 19 3...
Страница 111: ...19 Daikin 0 02 7 4 0 9 5 90 60 200 15 9 60 30 300...
Страница 113: ...21 0 011 0 09 1 2 3 R410A 4 8 R410A RZQ 20 24 RZQ 36 45 RZ Q R 48...
Страница 114: ...22 9 230 500...
Страница 115: ...V L N Y...
Страница 116: ...24 M4 1 8 1 2 M5 3 0 2 0 M4 1 9 1 4 M5 2 9 2 4...
Страница 117: ...Y V RZ Q R V Y 20 24 36 45 45 48 MCA A RZR48MUYMK...
Страница 118: ......
Страница 119: ...27 11 1 01 2 88 3 4 10 03 04 05 6 10 8 10 8 8 01 02 26 16 0 1...
Страница 121: ...29 RUN STOP 5 INSPECTION TEST OPERATION 00 INSPECTION TEST OPERATION 2 12 4 10 E3 E4 L8 U0 E3 E4 L4 U8 U1 U2 U4 UF UA...
Страница 122: ...30...
Страница 123: ......
Страница 124: ...3P369976 2C M14N103A 00_CV_3P369976 2C fm Page 2 Thursda y October 2 0 2016 9 36 AM http www daikin com global_ac...