On completion of the drainage check, refer to the following illustration, and use the provided large
sealing pad (6) and heat insulate the metal clamp (1) and drain hose (2).
8. DUCT WORK
Pay the utmost attention to the following items and conduct the ductwork.
•
Check that the duct will not be in excess of the setting range of external static pressure for the unit. (Refer
to the technical datasheet for the setting range.)
•
Attach a canvas duct each to the air outlet and air inlet so that the vibration of the equipment will not be
transmitted to the duct or ceiling.
Use a sound-absorbing material (insulation material) for the lining of the duct and apply vibration insulation
rubber to the hanging bolts.
•
At the time of duct welding, perform the curing of the duct so that the sputter will not come in contact with
the drain pan for the filter.
•
If the metal duct pass through a metal lath, wire lath, or metal plate of a wooden structure, separate the duct
and wall electrically.
•
Be sure to heat insulate the duct for the prevention of dew condensation. (Material: Glass wool or styrene
foam; Thickness: 25 mm)
•
Be sure to attach the field supply air filter to the air inlet of the unit or field supply inlet in the air passage on
the air suction side. (Be sure to select an air filter with a duct collection efficiency of 50 weight percent.)
•
Explain the operation and washing methods of the locally procured components (i.e., the air filter, air inlet
grille, and air outlet grille) to the customer.
•
Locate the air outlet grille on the indoor side for the prevention of drafts in a position where indirect contact
with people.
•
The air conditioner incorporates a function to adjust the fan to rated speed automatically.
(11. FIELD SETTING)
Therefore, do not use booster fans midway in the duct.
Connection method of ducts on air inlet and outlet sides.
•
Connect the field supply duct in alignment with the inner side of the flange.
•
Connect the flange and unit with the flange connection screw (3).
•
Wrap aluminum tape around the flange and duct joint in order to prevent air leakage.
CAUTION
Connect the flange and unit with the flange connection screw (3) regardless of whether the duct is con-
nected to the air inlet side.
Make sure that the
seam faces upward.
Metal clamp (1)
(accessory)
Large sealing pad (6)
(accessory)
4 mm max.
Unit
Insulation material
(field supply)
Canvas duct
(field supply)
Flange on air inlet side
(provided with the unit)
Insulation material
(field supply)
Air inlet
Air outlet
Screws for duct
flanges (3)
(accessory)
Screws
for duct
flanges (3)
(accessory)
Flange on air outlet side
(provided with the unit)
01_EN_3PN06583-10W.fm Page 14 Thursday, March 24, 2011 9:03 AM
Содержание FBQ20EAVAK
Страница 30: ...MEMO...
Страница 31: ...FBQ20EAVAK FBQ24EAVAK FBQ36EAVAK FBQ45EAVAK FBQ48EAVAK FBQ48EAVMK...
Страница 32: ......
Страница 33: ...R410A SUNISO R410A R410A R407C R410A R410A...
Страница 34: ...R410A M5 16 24 20 48 45 36 M4 8...
Страница 35: ...BRC1E62 BRC1D61 BRC1C61 BRC4C62 BRC4C64 FBQ48EAVMK BRC4C62...
Страница 36: ......
Страница 37: ...A 1 A 2...
Страница 38: ...M10 A 1 A 2 B D B C D 24 20 48 45 36...
Страница 39: ......
Страница 40: ...C RH C R410A R410A...
Страница 41: ...A...
Страница 42: ......
Страница 43: ...BCuP 2 JIS Z 3264 B Cu93P 710 795 ISO 3677...
Страница 44: ......
Страница 45: ......
Страница 46: ...ASSY...
Страница 47: ...X2M...
Страница 48: ...X1M X2M...
Страница 49: ......
Страница 50: ...36 24 20 48 45 FBQ48EAVMK...
Страница 51: ...P1 P2 2 P 1 P 2 P 1 P...
Страница 52: ...S M P1 P2...
Страница 53: ...L H...
Страница 54: ...Daikin LCD...
Страница 55: ......
Страница 56: ...A1 A3 A6 A8 AF AH AJ C1 C4 C6 C9 CC CJ E0 E1...
Страница 57: ...E3 E4 E5 E7 E9 F3 H3 H7 H9 J1 J2 J3 J5 J6 J7 J8 J9 JA JC L1 L4 L5 L8 L9 LC P1 P3 P4 PJ U0 U1 L3 L2 L1 U2...
Страница 58: ...U4 UF UF U5 U8 UA UC UJ...
Страница 59: ......
Страница 91: ...English 30 MEMO...
Страница 92: ...31 English MEMO...
Страница 93: ...R410A R410A SUNISO R410A R410A RZQ45LCVAK RZQ20LCVAK RZQ45MUYLK RZQ24LCVAK RZQ48MUYLK RZQ36LCVAK RZR48MUYMK...
Страница 94: ...2 1...
Страница 95: ...3 1 1 1 2 3 4 5 R410A SUNISO R410A R410A 33 3 3 R407C 40 4 0 R410A R410A...
Страница 96: ...4 2 1 2 48 2 2 1 1 2 1 2 3 1 3 3 71 PP 2 1...
Страница 97: ...5 3 1 4 6 3 2 5 5 4 1 1 1 5 1 5...
Страница 98: ...6 R410A 3 4 500 500 4 DB C 35 C 35 RZ Q R 48 RZQ20 24 RZ Q R 48 RZQ45 RZQ36 1 4 1 2 3 50 100 100 100 500 100...
Страница 103: ...11 4 2 1 3 1 B 1 2 40 D C 2 2 1 3 1 25 3 A 4 4 A D 5 4 4 4 1 3 2...
Страница 104: ...12 100 M12 6 20 6 1 6 R410A BCuP 11 8 6...
Страница 105: ...13 2 6 3 6 5 6 6 6 5 6 4 6 Suniso R407C R410A R410A 755 0 1...
Страница 107: ...15 10 7 11 16 10 11...
Страница 108: ...16 12 13 6 4 1 2 1 2 14 13 12 16 5 13 5 27 5 22 5...
Страница 109: ...17 15 15 75 C 30 20 80 C 30 C 120 13 9 11 5 14...
Страница 110: ...18 1 4 3 1 1 15 9 5 39 9 32 7 13 2 12 8 15 9 75 4 61 8 19 7 19 3...
Страница 111: ...19 Daikin 0 02 7 4 0 9 5 90 60 200 15 9 60 30 300...
Страница 113: ...21 0 011 0 09 1 2 3 R410A 4 8 R410A RZQ 20 24 RZQ 36 45 RZ Q R 48...
Страница 114: ...22 9 230 500...
Страница 115: ...V L N Y...
Страница 116: ...24 M4 1 8 1 2 M5 3 0 2 0 M4 1 9 1 4 M5 2 9 2 4...
Страница 117: ...Y V RZ Q R V Y 20 24 36 45 45 48 MCA A RZR48MUYMK...
Страница 118: ......
Страница 119: ...27 11 1 01 2 88 3 4 10 03 04 05 6 10 8 10 8 8 01 02 26 16 0 1...
Страница 121: ...29 RUN STOP 5 INSPECTION TEST OPERATION 00 INSPECTION TEST OPERATION 2 12 4 10 E3 E4 L8 U0 E3 E4 L4 U8 U1 U2 U4 UF UA...
Страница 122: ...30...
Страница 123: ......
Страница 124: ...3P369976 2C M14N103A 00_CV_3P369976 2C fm Page 2 Thursda y October 2 0 2016 9 36 AM http www daikin com global_ac...