English
28
〈
CAUTION
〉
Low Night Noise operation and demand operation using an external command requires a demand adapter PC
board (option). For more details, refer to the manual supplied with the adapter.
12. TEST RUNS
〈
WARNING
〉
•
Never perform a test run with the discharge piping thermistor (R2T) and suction piping thermistor (R3T)
removed, as this might break the compressor.
•
If the technician must leave the outdoor unit for some reason, switch places with another installation
technician or close the front panel.
•
Do not touch the drain pump or fan during test runs without the decoration panel installed on the indoor unit.
(Doing so could result in an electric shock or other injury.)
12-1 HOW TO TEST OPERATION
After the indoor and outdoor unit installation, be sure to perform the test operation in accordance with the
following procedure.
1.
Open the front panel and check that the liquid and gas sides of the stop valves are open.
<Be sure to close the front panel before the operation (Risk of electric shock)>
Note: After doing an air-purge with a vacuum pump, the refrigerant pressure may not rise even if the stop
valves are opened.
This is because the refrigerant piping path is closed off by the outdoor unit electronic expansion
valve, etc. There are no problems if the unit is run.
2.
Turn the power on at least 6 hours before operating the unit to protect the compressor.
3.
Set to cooling operation with the remote controller.
4.
Push the remote controller’s INSPECTION/TEST OPERATION button four times (twice on the wireless
remote controller) to enter test run mode.
Within 10 seconds, press the RUN/STOP button to start the test run. Check the unit, letting it run at least
3 minutes.
Note: In the first operation after installation, the COOL operation is performed for approx. 3 minutes even
when the HEAT operation is set. After that, the operation will be switched to the HEAT operation, but
this is normal. (The remote controller displays “HEAT operation”.)
Note: When the outside temperature is 24°C or more, the HEAT operation is not performed even if it is set,
but this is normal.
5.
Push INSPECTION/TEST OPERATION button and operate normally.
6.
Confirm function of unit according to the operation manual.
7.
If the decoration panel on the indoor unit has not been installed, turn off the power after the test run.
Remove the valve lid and turn the valve rod
counterclockwise with a hex wrench until is stops.
Direction to open
Direction to open
Liquid side
Gas side
01_EN_3P281953-1B.fm Page 28 Tu esday, January 25, 2011 3:35 PM
Содержание FBQ20EAVAK
Страница 30: ...MEMO...
Страница 31: ...FBQ20EAVAK FBQ24EAVAK FBQ36EAVAK FBQ45EAVAK FBQ48EAVAK FBQ48EAVMK...
Страница 32: ......
Страница 33: ...R410A SUNISO R410A R410A R407C R410A R410A...
Страница 34: ...R410A M5 16 24 20 48 45 36 M4 8...
Страница 35: ...BRC1E62 BRC1D61 BRC1C61 BRC4C62 BRC4C64 FBQ48EAVMK BRC4C62...
Страница 36: ......
Страница 37: ...A 1 A 2...
Страница 38: ...M10 A 1 A 2 B D B C D 24 20 48 45 36...
Страница 39: ......
Страница 40: ...C RH C R410A R410A...
Страница 41: ...A...
Страница 42: ......
Страница 43: ...BCuP 2 JIS Z 3264 B Cu93P 710 795 ISO 3677...
Страница 44: ......
Страница 45: ......
Страница 46: ...ASSY...
Страница 47: ...X2M...
Страница 48: ...X1M X2M...
Страница 49: ......
Страница 50: ...36 24 20 48 45 FBQ48EAVMK...
Страница 51: ...P1 P2 2 P 1 P 2 P 1 P...
Страница 52: ...S M P1 P2...
Страница 53: ...L H...
Страница 54: ...Daikin LCD...
Страница 55: ......
Страница 56: ...A1 A3 A6 A8 AF AH AJ C1 C4 C6 C9 CC CJ E0 E1...
Страница 57: ...E3 E4 E5 E7 E9 F3 H3 H7 H9 J1 J2 J3 J5 J6 J7 J8 J9 JA JC L1 L4 L5 L8 L9 LC P1 P3 P4 PJ U0 U1 L3 L2 L1 U2...
Страница 58: ...U4 UF UF U5 U8 UA UC UJ...
Страница 59: ......
Страница 91: ...English 30 MEMO...
Страница 92: ...31 English MEMO...
Страница 93: ...R410A R410A SUNISO R410A R410A RZQ45LCVAK RZQ20LCVAK RZQ45MUYLK RZQ24LCVAK RZQ48MUYLK RZQ36LCVAK RZR48MUYMK...
Страница 94: ...2 1...
Страница 95: ...3 1 1 1 2 3 4 5 R410A SUNISO R410A R410A 33 3 3 R407C 40 4 0 R410A R410A...
Страница 96: ...4 2 1 2 48 2 2 1 1 2 1 2 3 1 3 3 71 PP 2 1...
Страница 97: ...5 3 1 4 6 3 2 5 5 4 1 1 1 5 1 5...
Страница 98: ...6 R410A 3 4 500 500 4 DB C 35 C 35 RZ Q R 48 RZQ20 24 RZ Q R 48 RZQ45 RZQ36 1 4 1 2 3 50 100 100 100 500 100...
Страница 103: ...11 4 2 1 3 1 B 1 2 40 D C 2 2 1 3 1 25 3 A 4 4 A D 5 4 4 4 1 3 2...
Страница 104: ...12 100 M12 6 20 6 1 6 R410A BCuP 11 8 6...
Страница 105: ...13 2 6 3 6 5 6 6 6 5 6 4 6 Suniso R407C R410A R410A 755 0 1...
Страница 107: ...15 10 7 11 16 10 11...
Страница 108: ...16 12 13 6 4 1 2 1 2 14 13 12 16 5 13 5 27 5 22 5...
Страница 109: ...17 15 15 75 C 30 20 80 C 30 C 120 13 9 11 5 14...
Страница 110: ...18 1 4 3 1 1 15 9 5 39 9 32 7 13 2 12 8 15 9 75 4 61 8 19 7 19 3...
Страница 111: ...19 Daikin 0 02 7 4 0 9 5 90 60 200 15 9 60 30 300...
Страница 113: ...21 0 011 0 09 1 2 3 R410A 4 8 R410A RZQ 20 24 RZQ 36 45 RZ Q R 48...
Страница 114: ...22 9 230 500...
Страница 115: ...V L N Y...
Страница 116: ...24 M4 1 8 1 2 M5 3 0 2 0 M4 1 9 1 4 M5 2 9 2 4...
Страница 117: ...Y V RZ Q R V Y 20 24 36 45 45 48 MCA A RZR48MUYMK...
Страница 118: ......
Страница 119: ...27 11 1 01 2 88 3 4 10 03 04 05 6 10 8 10 8 8 01 02 26 16 0 1...
Страница 121: ...29 RUN STOP 5 INSPECTION TEST OPERATION 00 INSPECTION TEST OPERATION 2 12 4 10 E3 E4 L8 U0 E3 E4 L4 U8 U1 U2 U4 UF UA...
Страница 122: ...30...
Страница 123: ......
Страница 124: ...3P369976 2C M14N103A 00_CV_3P369976 2C fm Page 2 Thursda y October 2 0 2016 9 36 AM http www daikin com global_ac...