![Daikin EWLD160~550G-SS Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/daikin/ewld160-550g-ss/ewld160-550g-ss_installation-operation-and-maintenance-manual_501677006.webp)
D-EIMWC00208-16EN - 6/48
General information
ATTENTION
The units described in the present manual represent a valuable investment. Maximum care should be taken to
ensure correct installation and appropriate working conditions of the units.
Correct maintenance of th
e unit is indispensable for its safety and reliability. Manufacturer’s service centres are the
only having adequate technical skill for maintenance.
ATTENTION
This manual provides information about the features and procedures for the complete series.
All units are delivered from factory as complete sets which include wiring diagrams and dimensional drawings with
size, weight and features of each model.
WIRING
DIAGRAMS
AND
DIMENSIONAL
DRAWINGS
MUST
BE
CONSIDERED
ESSENTIAL
DOCUMENTS
OF
THIS
MANUAL
In case of any discrepancy between this manual and the two aforesaid documents, please refer to the wiring diagram
and dimensional drawings.
IMPORTANT
The present Installation and Maintenance Manual is drawn up for information only and does not co nstitute an offer
binding upon Daikin.
Specifications are subject to change without prior notice. Refer to the data communicated at the time of the order as
per the “Documents Certified” such as “Dimensional Drawings”, “Wiring diagrams” and “Nameplate”. Daikin explicitly
rejects any liability for any direct or indirect damage, in the broadest sense, arising from or related to the use and/or
interpretation of this Installation and Maintenance Manual.
Safe use and maintenance of the unit, as explained in this Maintenance and Use Manual, is fundamental to prevent any
accidents occurring to operators during both operation and maintenance as well as during repair work.
Therefore, it is highly recommended that this document be read carefully, complied with and stored safely.
Warnings for the operator
READ THIS MAINTENANCE AND USE MANUAL BEFORE USING THE UNIT
THE OPERATOR MUST BE TRAINED AND INSTRUCTED ON HOW TO USE THE UNIT
THE OPERATOR MUST STRICTLY FOLLOW ALL INSTRUCTIONS, SAFETY REGULATIONS AND
LIMITATIONS REGARDING THE USE OF THE UNIT.
Assistance
Should additional maintenance be required, it is advisable to consult authorised staff before carrying out any repair work.
Spare parts
Spare parts to be used for maintenance of the unit must be original. Therefore, always consult the manufacturer.
Receiving the machine
The machine must be inspected for any possible damage immediately upon reaching its final place of installation. All
components described in the delivery note must be carefully inspected and che cked; any damage must be reported to
the carrier. Before connecting the machine to earth, check that the model and power supply voltage shown on the
nameplate are correct. Responsibility for any damage after acceptance of the machine cannot be attributed t o the
manufacturer.
Checks
To prevent the possibility of incomplete delivery (missing parts) or transportation damage, please perform the following
checks upon receipt of the machine:
Содержание EWLD160~550G-SS
Страница 14: ...D EIMWC00208 16EN 14 48 Fig 7 Condenser Located above Chiller Unit Fig 8 Condenser Located below Chiller Unit...
Страница 21: ...D EIMWC00208 16EN 21 48 Fig 10 Refrigeration cycle EWWD G SS EWWD G XS 23 5 bar...
Страница 22: ...D EIMWC00208 16EN 22 48 Fig 11 Refrigeration cycle EWWD G SS EWWD G XS Partial Heat recovery 23 5 bar...
Страница 23: ...D EIMWC00208 16EN 23 48 Fig 12 Refrigeration cycle EWLD G SS OPTIONAL 23 5 bar...
Страница 45: ...D EIMWC00208 16EN 45 48...
Страница 46: ...D EIMWC00208 16EN 46 48...
Страница 47: ...D EIMWC00208 16EN 47 48...