1

Check with the hydraulic configuration which space
heating loops can be closed by mechanical,
electronic, or other valves.

2

Close all space heating loops that can be closed
(see previous step).

3

Create a thermo request on the main zone only.

4

Wait 1 minute until the unit is stabilized.

5

If the additional pump is still assisting (the green
LED on the right hand sided pump is ON) increase
the flow until the additional pump is not assisting
anymore (LED is OFF).

6

Go to [8.4.A]: 

Information

 > 

Sensors

 > 

Flow

rate

.

7

Read out the flow rate and modify the bypass valve
setting to reach the minimum required flow rate + 2 l/
min.

Minimum required flow rate

25 l/min

8.2.2

To perform an air purge

1

Set the user permission level to Installer. See 

"To

change the user permission level"

 [

4

 21].

2

Go to [A.3]: 

Commissioning

 > 

Air purge

.

3

Select 

OK

 to confirm.

Result: 

The air purge starts. It stops automatically

when air purge cycle is finished.

To stop the air purge manually:

1

Go to 

Stop air purge

.

2

Select 

OK

 to confirm.

INFORMATION

When  air  purging  in  automatic  mode,  the  first  air  purge  is
always  for  the  main  zone,  the  second  started  air  purge  is
always  for  the  additional  zone.  To  air  purge  the  domestic
hot water tank circuit, choose [A.3.1.5.2] 

Circuit

=

Tank

 at

the  start  of  the  manual  air  purge  of  the  main  zone  or
additional zone.

8.2.3

To perform an operation test run

INFORMATION

The  test  run  only  applies  to  the  additional  temperature
zone.

1

Set the user permission level to 

Installer

. See 

"To

change the user permission level"

 [

4

 21].

2

Go to [A.1]: 

Commissioning

 > 

Operation test

run

.

3

Select a test from the list. 

Example: 

Heating

.

4

Select 

OK

 to confirm.

Result: 

The test run starts. It stops automatically

when ready (±30 min).

To stop the test run manually:

1

In the menu, go to 

Stop test run

.

2

Select 

OK

 to confirm.

INFORMATION

If  the  outdoor  temperature  is  outside  the  range  of
operation,  the  unit  may  NOT  operate  or  may  NOT  deliver
the required capacity.

To monitor leaving water and tank temperatures

During test run, the correct operation of the unit can be checked by
monitoring its leaving water temperature (heating/cooling mode) and
tank temperature (domestic hot water mode).

To monitor the temperatures:

1

In the menu, go to 

Sensors

.

2

Select the temperature information.

8.2.4

To perform an actuator test run

Purpose

Perform an actuator test run to confirm the operation of the different
actuators.  For  example,  when  you  select 

Pump

,  a  test  run  of  the

pump will start.

1

Set the user permission level to Installer. See 

"To

change the user permission level"

 [

4

 21].

2

Go to [A.2]: 

Commissioning

 > 

Actuator test run

.

3

Select a test from the list. 

Example: 

Pump

.

4

Select 

OK

 to confirm.

Result: 

The actuator test run starts. It stops

automatically when ready (±30 min).

To stop the test run manually:

1

In the menu, go to 

Stop test run

.

2

Select 

OK

 to confirm.

Possible actuator test runs

Backup heater 1

 test

Backup heater 2

 test

Pump

 test

INFORMATION

Make  sure  that  all  air  is  purged  before  executing  the  test
run. Also avoid disturbances in the water circuit during the
test run.

Shut off valve

 test

Diverter  valve

  test  (3-way  valve  for  switching  between  space

heating and tank heating)

Bivalent signal

 test

Alarm output

 test

C/H signal

 test

DHW pump

 test

Bizone  kit  direct  pump

  test  (bizone  kit  EKMIKPOA  or

EKMIKPHA)

Bizone  kit  mixed  pump

  test  (bizone  kit  EKMIKPOA  or

EKMIKPHA)

Bizone  kit  mixing  valve

  test  (bizone  kit  EKMIKPOA  or

EKMIKPHA)

8.2.5

To perform an underfloor heating screed
dryout

1

Set the user permission level to Installer. See 

"To

change the user permission level"

 [

4

 21].

2

Go to [A.4]: 

Commissioning

 > 

UFH screed dryout

.

3

Set a dryout program: go to 

Program

 and use the

UFH screed dryout programming screen.

4

Select the zone where you want to perform the UFH
screed dryout program: go to the 

Zone selection

screen.

Содержание ETVZ16S23EA9W

Страница 1: ...https daikintechnicaldatahub eu Installation manual Daikin Altherma 3 H HT F English Installation manual Daikin Altherma 3 H HT F ETVZ16S18EA6V ETVZ16S23EA6V ETVZ16S18EA9W ETVZ16S23EA9W...

Страница 2: ...imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m u skladu sa slijede im standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s na im uputama 16...

Страница 3: ...figuration wizard 22 7 2 1 Configuration wizard Language 22 7 2 2 Configuration wizard Time and date 22 7 2 3 Configuration wizard System 22 7 2 4 Configuration wizard Backup heater 24 7 2 5 Configura...

Страница 4: ...NING Field piping method MUST be in accordance with the instructions from this manual See 5 Piping installation 48 WARNING Install the tundish away from any electrical device Possible consequence Elec...

Страница 5: ...underfloor heating in the main zone this is the zone with the lowest water temperature radiators in the additional zone this is the zone with the highest water temperature 4 1 1 Installation site req...

Страница 6: ...the cables from the back of the user interface panel to prevent damage 2 1 1 3 4 X14Y X1A 3 Remove the switch box cover 4 T25 4 If necessary remove the front plate This is for example necessary in the...

Страница 7: ...e pallet and place it on the floor Also see 3 1 2 To handle the indoor unit 45 2 Connect the drain hose to the drain See 4 3 2 To connect the drain hose to the drain 47 3 Slide the indoor unit into po...

Страница 8: ...the water volume and flow rate Minimum water volume Check that the total water volume in the installation is minimum 20 litres the internal water volume of the outdoor unit NOT included NOTICE When ci...

Страница 9: ...o domestic cold water in and domestic hot water out connections These shut off valves are field supplied NOTICE Overpressure bypass valve delivered as accessory We recommend to install the overpressur...

Страница 10: ...nce the presence may lead to the precipitation of certain components in the glycol s corrosion inhibitor NOTICE Glycol absorbs water from its environment Therefore do NOT add glycol that has been expo...

Страница 11: ...ual of the outdoor unit or the installer reference guide 6 Electrical installation DANGER RISK OF ELECTROCUTION WARNING ALWAYS use multicore cable for power supply cables CAUTION Do NOT push or place...

Страница 12: ...aximum length 500 m 2 9 Control 1 6 Room sensor offset Item Description WLAN module See Installation manual of the WLAN module Addendum book for optional equipment Use the cable delivered with the WLA...

Страница 13: ...connect X11Y to X11YB The necessity of separate normal kWh rate power supply to indoor unit b X2M 5 6 depends on the type of preferential kWh rate power supply Separate connection to the indoor unit i...

Страница 14: ...Q1DI a b a Factory mounted cable connected to the contactor of the backup heater inside the switch box K5M b Field wiring see table below Model power supply Connections to backup heater power supply 6...

Страница 15: ...th transistor output check the polarity The positive polarity MUST be connected to X5M 6 and X5M 4 the negative polarity to X5M 5 and X5M 3 1 Open the following see 4 2 1 To open the indoor unit 46 1...

Страница 16: ...P1HBAA is required A Y1 7 B A B 7 9 X2M A4P Y1 YC X1M a b a Installation of EKRP1HBAA is required b Prewiring between X2M 7 9 and Q1L thermal protector backup heater Do NOT change 3 Fix the cable with...

Страница 17: ...2 3 2 User interface panel 3 Upper switch box cover 2 Connect the changeover to external heat source cable to the appropriate terminals as shown in the illustration below A X1 X2 L N B A B A4P X2M X1...

Страница 18: ...ION Installation of a safety thermostat field supply is required for the main zone otherwise the unit will NOT operate NOTICE A safety thermostat MUST be installed on the main zone to avoid too high w...

Страница 19: ...kit EKRELSG The 2 incoming Smart Grid contacts can activate the following Smart Grid modes Smart Grid contact Smart Grid operation mode 1 2 0 0 Free running 0 1 Forced off 1 0 Recommended on 1 1 Force...

Страница 20: ...P 2 Low voltage connections STEP 3 High voltage connections 1 High voltage Smart Grid contact 1 2 High voltage Smart Grid contact 2 a b Coil sides of relays c d Contact sides of relays e Jumper factor...

Страница 21: ...wizard starts to help you configure the system Restart the configuration wizard If the system is already configured you can restart the configuration wizard To restart the configuration wizard go to I...

Страница 22: ...tton to go back to the home screen INFORMATION When you change the overview settings and you go back to the home screen the user interface will show a popup screen and request to restart the system Wh...

Страница 23: ...ure of the user interface only INFORMATION If a heat pump failure occurs and Emergency is set to Manual the room frost protection function the underfloor heating screed dryout function and the water p...

Страница 24: ...have a big impact on the required time for the unit to heat up the domestic hot water tank Capacity step 1 Code Description 9 3 4 6 03 The capacity of the first step of the backup heater at nominal vo...

Страница 25: ...set or custom Code Description 2 1 N A 0 No 1 Yes 7 2 6 Configuration wizard Additional zone The most important settings for the additional leaving water zone can be set here Emitter type For more inf...

Страница 26: ...North wall of the building If the outdoor temperature drops or rises the unit compensates instantly Thus the unit does not have to wait for feedback by the thermostat to increase or decrease the tempe...

Страница 27: ...s of outdoor ambient temperature Item Description Y1 Y2 Y3 Y4 Examples of desired tank temperature or leaving water temperature The icon corresponds to the heat emitter for that zone Underfloor heatin...

Страница 28: ...esented here 7 4 1 Main zone Thermostat type Only applicable in external room thermostat control Following combinations are possible to control the unit not applicable when C 07 0 C 07 2 Room thermost...

Страница 29: ...ctrical heaters Limit setting kW Enable room buffering Allow heater Allow pump 9 Installer settings Configuration wizard Domestic hot water Backup heater Emergency Balancing Water pipe freeze preventi...

Страница 30: ...local supply panel and the indoor unit Between the indoor unit and the valves if applicable Between the indoor unit and the room thermostat if applicable The system is properly earthed and the earth t...

Страница 31: ...the menu go to Stop test run 2 Select OK to confirm INFORMATION If the outdoor temperature is outside the range of operation the unit may NOT operate or may NOT deliver the required capacity To monit...

Страница 32: ...2 06 to 0 and KEEP it disabled until the screed dryout has finished Ignoring this notice will result in cracking of the screed NOTICE For the underfloor heating screed dryout to be able to start make...

Страница 33: ...e main mixed zone a2 Space heating additional direct zone Water OUT screw connection 1 M3S 3 way valve space heating domestic hot water b1 Space heating main mixed zone Water IN screw connection 1 R1T...

Страница 34: ...10 Technical data Installation manual 34 ETVZ16S18 23EA6V 9W Daikin Altherma 3 H HT F 4P644730 1 2021 02 q Loose nut 1...

Страница 35: ...stor External thermistor Heat pump convector Heat pump convector Add LWT Additional leaving water temperature On OFF thermostat wired On OFF thermostat wired On OFF thermostat wireless On OFF thermost...

Страница 36: ...oltage Smart Grid For safety thermostat For safety thermostat For safety thermostat For safety thermostat For smartgrid For Smart Grid Inrush Inrush current Max load Maximum load Normally closed Norma...

Страница 37: ...core 2 core 2 core 2 core 2 core 3 core R2T External sensor floor or ambient Only for KRTETS signal 2 core 3m included A14P P1 P2 user interface Only for Human Comfort Interface Only for KRTR wireles...

Страница 38: ......

Страница 39: ......

Страница 40: ...4P644730 1 2021 02 Copyright 2021 Daikin 4P644730 1 0000000M Verantwortung f r Energie und Umwelt...

Отзывы: