To monitor leaving water and tank temperatures
During test run, the correct operation of the unit can be checked by monitoring its
leaving water temperature (heating/cooling mode) and tank temperature
(domestic hot water mode).
To monitor the temperatures:
1
In the menu, go to
Sensors
.
2
Select the temperature information.
11.4.4 Actuator test run
Purpose
Perform an actuator test run to confirm the operation of the different actuators.
For example, when you select
Pump
, a test run of the pump will start.
To perform an actuator test run
Conditions:
Make sure all operation is disabled. Go to [C]:
Operation
and turn off
Space heating/cooling
and
Tank
operation.
1
Set the user permission level to Installer. See
—
2
Go to [A.2]:
Commissioning
>
Actuator test run
.
3
Select a test from the list.
Example:
Pump
.
4
Select
OK
to confirm.
Result:
The actuator test run starts. It stops automatically when
ready (±30 min).
To stop the test run manually:
—
1
In the menu, go to
Stop test run
.
2
Select
OK
to confirm.
Possible actuator test runs
NOTICE
For the backup heater test run, make sure that at least one of the two mixing valves
of the unit is open during the test. Otherwise the thermal cut-out of the backup
heater may be triggered.
▪
Backup heater 1
test
▪
Backup heater 2
test
▪
Pump
test
INFORMATION
Make sure that all air is purged before executing the test run. Also avoid disturbances
in the water circuit during the test run.
▪
Shut off valve
test
▪
DHW signal
test
▪
Bivalent signal
test
▪
Alarm output
test
Содержание ETSHB16P30EF
Страница 304: ...16 16...
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ...4P679467 1 2022 02 Copyright 2022 Daikin 4P679467 1 0000000 Verantwortung f r Energie und Umwelt...