8
|
Piping installation
Installer reference guide
101
EPRA14~W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
b
a
a
c
b
a
Drainback connection
b
Spillover connection
c
Hose with non-return valve (1/2")
With installed drainback solar kit (option)
1
Combine the fill and drain kit (option) with the drainback solar kit (option) to
fill the storage tank.
2
Connect the hose with non-return valve to the fill and drain kit.
Follow the steps described in the previous chapter.
8.2.9 To insulate the water piping
The piping in the complete water circuit MUST be insulated to prevent
condensation during cooling operation and reduction of the heating and cooling
capacity.
Содержание ETSHB16P30EF
Страница 304: ...16 16...
Страница 305: ......
Страница 306: ......
Страница 307: ......
Страница 308: ...4P679467 1 2022 02 Copyright 2022 Daikin 4P679467 1 0000000 Verantwortung f r Energie und Umwelt...