Installation and operation manual
5
EKEXMCBV3
Option kit for combination of Daikin condensing units
with field supplied evaporators
4PW32096-1
6
Braze the field piping.
7
After brazing, put the lower pipe insulation back in place and
close it with the upper insulation cover (after pealing off the
liner).
8
Secure the pipe fixing clamp (C) in place again (2x M5).
9
Make sure that field pipes are fully insulated.
Field pipe insulation must reach up to the insulation you have
put back in place as per procedure step 7. Make sure that there
is no gap between both ends in order to avoid condensation
dripping (finish the connection with tape eventually).
Electrical work
1
Open the electrical box cover (A).
2
Push out ONLY the second lower wire intake hole (B) from
inside to outside. Do not damage the membrane.
3
Pass valve cable (with wires Y1 ... Y6) from the control box
through that membrane wire intake hole and connect the cable
wires into the terminal connector (C) following instructions as
described in step 4. Route the cable out of the valve kit box
according to figure below and fix with the tie wrap (D). See
"Electric wiring work" on page 5
for more details.
4
Use a small screwdriver and follow indicated instructions for
connecting cable wires into the terminal connector according to
the wiring diagram.
5
Make sure that field wiring and insulation is not squeezed when
closing the valve kit box cover.
6
Close the valve kit box cover (4x M5).
I
NSTALLATION
OF
THE
ELECTRICAL
CONTROL
BOX
(See
)
Mechanical installation
1
Fix the control box with its hanger brackets to the mounting
surface.
Use 4 screws (for holes of Ø6 mm).
2
Open the lid of the control box.
3
For electrical wiring: refer to paragraph
4
Install the screw nuts.
5
Close the unnecessary openings with stoppers (closing cups).
6
Close the lid securely after installation to ensure that the control
box is watertight.
E
LECTRIC
WIRING
WORK
■
All field supplied parts and materials and electric works must be
conform to local codes.
■
Use copper wire only.
■
All wiring must be performed by an authorized electrician.
■
A main switch or other means for disconnection, having a
contact separation in all poles, must be incorporated in the fixed
wiring in accordance with relevant local and national legislation.
■
Refer to the installation manual attached to the outdoor unit for
the size of power supply electric wire connected to the outdoor
unit, the capacity of the circuit breaker and switch, wiring and
wiring instructions.
Connection of the wires inside the control box
1
For connection to outdoor unit and to controller (field supply):
Pull the wires inside through the screw nut and close the nut
firmly in order to ensure a good pull relieve and water protection.
2
The cables require an additional pull-
relief. Strap the cable with the installed tie
wrap.-
■
Make sure to cool the filters and valve body with
a wet cloth and make sure the body temperature
does not exceed 120°C during brazing.
■
Make sure that the other parts such as electrical
box, tie wraps and wires are protected from direct
brazing flames during brazing.
A C
D
B
4
1
2
3
1
Control box
2
Hanger brackets
3
Main PCB
4
Transformer
5
Terminal
6
Optional PCB (KRP4)
Содержание EKEXMCBV3
Страница 13: ...NOTES NOTES ...
Страница 14: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW32096 1 ...