Commissioning

NOTICE

NEVER  operate  the  unit  without  thermistors  and/or
pressure  sensors/switches.  Burning  of  the  compressor
might result.

6.1

Checklist before commissioning

Do NOT operate the system before the following checks are OK:

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The following 

field wiring

 has been carried out according

to this document and the applicable legislation:

▪ Between the local supply panel and the outdoor unit

▪ Between indoor unit and outdoor unit

▪ Between the local supply panel and the indoor unit

▪ Between the indoor unit and the valves (if applicable)

▪ Between  the  indoor  unit  and  the  room  thermostat  (if

applicable)

▪ Between  the  indoor  unit  and  the  domestic  hot  water

tank (if applicable)

▪ Between  the  gas  boiler  and  the  local  supply  panel

(only applicable in case of hybrid system)

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

Depending  on  the  backup  heater  type, 

backup  heater

circuit breaker

 F1B on the switch box is turned ON.

Only for tanks with built-in booster heater:

The 

booster  heater  circuit  breaker

  F2B  on  the

switch box is turned ON.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

There is NO 

water leak

 inside the indoor unit.

The 

shut-off valves

 are properly installed and fully open.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

The 

air purge

 valve is open (at least 2 turns).

The 

pressure relief valve

 purges water when opened.

The 

minimum  water  volume

  is  guaranteed  in  all

conditions.  See  "To  check  the  water  volume"  in

"3.2 Preparing water piping" on page 4

.

INFORMATION

The  software  is  equipped  with  an  "installer-on-site"  mode
([4‑0E]),  that  disables  automatic  operation  by  the  unit.  At
first  installation,  setting  [4‑0E]  is  by  default  set  to  "1",
meaning  automatic  operation  is  disabled.  All  protective
functions  are  then  disabled.  If  the  user  interface  home
pages  are  off,  the  unit  will  NOT  operate  automatically.  To
enable  automatic  operation  and  the  protective  functions,
set [4‑0E] to "0".

36 hours after the first power-on, the unit will automatically
set  [4‑0E]  to  "0",  ending  "installer-on-site"  mode  and
enabling  the  protective  functions.  If  –  after  first
installation  –  the  installer  returns  to  the  site,  the  installer
has to set [4‑0E] to "1" manually.

6.2

Checklist during commissioning

The 

minimum  flow  rate

  during  backup  heater/defrost

operation  is  guaranteed  in  all  conditions.  See  "To  check
the  water  volume  and  flow  rate"  in 

"3.2  Preparing  water

piping" on page 4

.

To perform an 

air purge

.

To perform a 

test run

.

To perform an 

actuator test run

.

Underfloor screed dryout function

The  underfloor  screed  dryout  function  is  started  (if
necessary).

6.2.1

To check the minimum flow rate

1

Confirm  according  to  the  hydraulic  configuration  which  space
heating  loops  can  be  closed  due  to  mechanical,  electronic,  or
other valves.

2

Close all space heating loops that can be closed (see previous
step).

3

Start  the  pump  test  run  operation  (see 

"6.2.4  To  perform  an

actuator test run" on page 19

).

4

Go to [6.1.8]: 

 > Information > Sensor information > Flow rate

to check the flow rate. During pump test run operation, the unit
can operate below this minimum required flow rate.

Bypass valve foreseen?

Yes

No

Modify the bypass valve setting
to reach the minimum required
flow rate + 2 l/min

In case the actual flow rate is
below the minimum flow rate,
modifications at the hydraulic
configuration are required.
Increase the space heating loops
that can NOT be closed or install
a pressure‑controlled bypass
valve.

Minimum required flow rate during defrost/backup heater
operation

04+08 models

12 l/min

11+16 models

15 l/min

Содержание EHVH08S18CB

Страница 1: ...ature split English Installation manual Daikin Altherma Low temperature split EHVH04S18CB EHVH08S18CB EHVH08S26CB EHVH11S18CB EHVH11S26CB EHVH16S18CB EHVH16S26CB EHVX04S18CB EHVX08S18CB EHVX08S26CB EH...

Страница 2: ...ohjeidemme mukaisesti za p edpokladu e jsou vyu v ny v souladu s na imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m u skladu sa slijede im standardom ima ili drugim normativnim do...

Страница 3: ...Basic configuration 13 5 2 1 Quick wizard Language time and date 13 5 2 2 Quick wizard Standard 13 5 2 3 Quick wizard Options 14 5 2 4 Quick wizard Capacities energy metering 15 5 2 5 Space heating co...

Страница 4: ...stic pipes make sure they are fully oxygen diffusion tight according to DIN 4726 The diffusion of oxygen into the piping can lead to excessive corrosion 3 2 1 To check the water volume and flow rate M...

Страница 5: ...rmostat 2 d a Refer to name plate on outdoor unit b Minimum cable section 0 75 mm c Cable section 2 5 mm d Cable section 0 75 mm till 1 25 mm maximum length 50 m Voltage free contact shall ensure the...

Страница 6: ...on of the piping can cause malfunctioning of the unit To facilitate service and maintenance 2 shut off valves are provided Mount the valves on the space heating water inlet and space heating water out...

Страница 7: ...isconnect the water supply hose from the fill valve 4 4 4 To fill the domestic hot water tank 1 Open every hot water tap in turn to purge air from the system pipe work 2 Open the cold water supply val...

Страница 8: ...over to external heat source control Space cool heat operation control CAUTION Do NOT push or place redundant cable length in the unit 4 5 3 To connect the main power supply 1 Connect the main power s...

Страница 9: ...the equipment is connected only to a supply with a system impedance Zsys less than or equal to Zmax 1 Connect the backup heater power supply For 3V models a double pole fuse is used for F1B For 9W mo...

Страница 10: ...e shape of the backside of the user interface by overtightening the mounting screws Fix the wallplate of the user interface to the wall 4 Connect as shown in 4A Connect as shown in 4A 4B 4C or 4D 5 Re...

Страница 11: ...put cable to the appropriate terminals as shown in the illustration below X1M X2M 29 X1M YC Y1 Y2 Y3 Y4 A4P X2M a a Installation of EKRP1HB is required 2 Fix the cable with cable ties to the cable tie...

Страница 12: ...indoor unit 4 6 2 To close the indoor unit 1 Close the switch box cover 2 Reinstall the top plate 3 Reinstall the front panel NOTICE When closing the indoor unit cover make sure that the tightening t...

Страница 13: ...rface will return to the default home screen To modify an overview setting Example Modify 1 01 from 15 to 20 1 Go to A 8 Installer settings Overview settings 2 Go to the corresponding screen of the fi...

Страница 14: ...6 an error code will appear and the system will NOT operate A 2 2 A D 02 Domestic hot water pump 0 No NOT installed 1 Secondary rtrn Installed for instant hot water 2 Disinf shunt Installed for disin...

Страница 15: ...led 100 pulse kWh 5 Installed 1000 pulse kWh A 2 2 9 D 09 Optional external kWh meter 2 0 No NOT installed 1 Installed 0 1 pulse kWh 2 Installed 1 pulse kWh 3 Installed 10 pulse kWh 4 Installed 100 pu...

Страница 16: ...nabled This is the value by which the desired leaving water temperature is increased or lowered INFORMATION When leaving water temperature modulation is enabled the weather dependent curve needs to be...

Страница 17: ...trol Averaging time Ext amb sensor offset Forced defrost Commissioning Test run UFH screed dryout Air purge Actuator test run Standard Unit type Compressor type Indoor software type BUH type Backup he...

Страница 18: ...unit are fully open The air purge valve is open at least 2 turns The pressure relief valve purges water when opened The minimum water volume is guaranteed in all conditions See To check the water vol...

Страница 19: ...p heater step 1 test Backup heater step 2 test Pump test INFORMATION Make sure that all air is purged before executing the test run Also avoid disturbances in the water circuit during the test run Sol...

Страница 20: ...OUT Space heating cooling water IN Domestic hot water hot water out Domestic hot water cold water in Field installed Shut off valve with drain fill valve Field installed Shut off valve with drain fil...

Страница 21: ...ess Ext thermistor External thermistor Heat pump convector Heat pump convector Add LWT Additional leaving water temperature On OFF thermostat wired On OFF thermostat wired On OFF thermostat wireless O...

Страница 22: ...by PCB English Translation 230 V AC supplied by PCB 230 V AC supplied by PCB Continuous Continuous current DHW pump output Domestic hot water pump output DHW pump Domestic hot water pump Electrical me...

Страница 23: ...main X2M 1 4 add X2M 1a 4 main X2M 1 2 3 4 add X2M 1a 2a 3 4 main X2M 1 2 4 add X2M 1a 2a 4 NC valve X2M 5 7 NO valve X2M 6 7 2 core 2 core 2 core 2 core 2 core 2 core signal 5 core 3 core 4 or 3 core...

Страница 24: ...4P384971 1E 2018 02 Copyright 2014 Daikin 4P384971 1 E 00000006...

Отзывы: