![Daikin BYBCQ40HW1 Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/daikin/bybcq40hw1/bybcq40hw1_installation-manual_3213494007.webp)
English
6
〈〈
CAUTION
〉〉
Make sure there will be no clearance between the indoor unit and decoration panel and between the ceiling
and decoration panel.
1
If there is clearance, it may cause failure such as
Fig. 12.
•
If tightening of screw is not strong enough, make sure to tighten the screw described in
(5)
and
(6)
so
that no clearance is generated.
•
If there is still clearance between the ceiling and decoration panel after tightening the screw, adjust
the height of the indoor unit.
2
If the position of the hung indoor unit is too high, it may generate clearance as
Fig. 13.
•
Lower the hung indoor unit toward the ceiling.
•
If clearance is generated after taking measures as above for the ceiling, which is not strong enough
such as integrated ceiling, reinforce the opening part to give enough strength.
Ceiling surface
5)
Make no clearance.
(all around)
Decoration panel
Fig. 11
Air leakage
Air leakage at the ceiling
Dew attached, Dew dipping
Contamination
Fig. 12
The panel will become
deformed and generate
clearance.
If the ceiling is not strong
enough such as Integrated
ceiling, the ceiling will float
and generate clearance.
Fig. 13
01_EN_3P328940-1.fm Page 6 Monday, September 24, 2012 10:00 AM