System Configuration
SiBE01-503
28
System Configuration
1. System Configuration
After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
Содержание ARY20DV2
Страница 1: ...SiBE01 503 SPLIT Pair D Series Applied Models zNon Inverter Pair Heat Pump ...
Страница 5: ...SiBE01 503 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 10: ...SiBE01 503 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 13: ...Functions SiBE01 503 4 List of Function ...
Страница 14: ...SiBE01 503 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 21: ...Printed Circuit Board Connector Wiring Diagram SiBE01 503 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 35: ...Control Specification SiBE01 503 26 Functions and Control ...
Страница 59: ...Instructions SiBE01 503 50 System Configuration ...
Страница 79: ...Check SiBE01 503 70 Service Diagnosis ...
Страница 117: ...Others SiBE01 503 108 Others ...