SiBE01-503
Outdoor Unit
Removal Procedure
97
2.3
Removal of Electrical Device Mounting Plate
Procedure
Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. To remove the shelter.
1
Remove the three fixed
screws for removing the
shelter
.
2
Remove the shelter.
2. To remove the
switch box
.
1
Remove all the harness.
2
Remove two fixing
screws of electrical
device mounting plate.
3
Remove the electrical
device mounting plate.
Содержание ARY20DV2
Страница 1: ...SiBE01 503 SPLIT Pair D Series Applied Models zNon Inverter Pair Heat Pump ...
Страница 5: ...SiBE01 503 iv Table of Contents Index i Drawings Flow Charts iii ...
Страница 10: ...SiBE01 503 List of Function 1 Part 1 List of Function 1 Functions 2 ...
Страница 13: ...Functions SiBE01 503 4 List of Function ...
Страница 14: ...SiBE01 503 Specifications 5 Part 2 Specifications 1 Specifications 6 ...
Страница 21: ...Printed Circuit Board Connector Wiring Diagram SiBE01 503 12 Printed Circuit Board Connector Wiring Diagram ...
Страница 35: ...Control Specification SiBE01 503 26 Functions and Control ...
Страница 59: ...Instructions SiBE01 503 50 System Configuration ...
Страница 79: ...Check SiBE01 503 70 Service Diagnosis ...
Страница 117: ...Others SiBE01 503 108 Others ...