Outline of Control (Indoor Unit)
ESIE09-08A
72
Function
2. Storage operation
When requesting space heating and domestic water heating (storage) at the same time, this involves
that the storage function is active and the start timer is reached (setting 1) during space heating
operation. The 3-way valve will switch over to domestic water heating operation. Now domestic
water will be produced till set point is reached or according to the running timer (setting [d-01]). The
3-way valve will switch back to space heating mode for the interval period (setting [d-02]). After this
interval the 3-way valve will go back to domestic water mode. This will continue till set point is
reached. At that moment, simultaneous request is finished and the system goes back to space heating
mode.
H
Domestic hot water reheat minimum temperature [b-00]
J
Domestic hot water reheat maximum temperature [b-01]
M
Simultaneous demand
N
ONLY space heating request
ON
ON
OFF
OFF
A
Operation
Space heating
Domestic water heating
B
Domestic hot water storage thermo-on request
C
Domestic hot water tank temperature
D
Leaving water thermo-on request
F
Domestic hot water lower limit temperature
G
Domestic hot water upper limit temperature (maximum possible storage temperature) [b-03]
M
Simultaneous demand
N
ONLY space heating request
O
Start of interval period
P
Stop of interval period
ON
ON
OFF
OFF
1
Maximum operation time for 1 cycle of domestic water heating (initial 30 minutes [d-01])
2
Interval minimum stop time for domestic water heating (initial 15 minutes [d-02])
3
Maximum operation time for domestic water heating (initial 30 minutes [d-01])
A
M
O
P
N
B
C
75°C
35°C
ON
G
F
OFF
D
ON
OFF
1
2
3
Содержание ALTHERMA HT EKBUHAA6 V3
Страница 2: ......
Страница 7: ...ESIE09 08A Table of Contents v 1 3 Service Tools 283 Index i Drawings Flow Charts iii ...
Страница 13: ...ESIE09 08A General Information 1 Part 1 General Information 1 Model Names of Indoor Outdoor Units Tanks 2 ...
Страница 16: ...Model Names of Indoor Outdoor Units Tanks ESIE09 08A 4 General Information ...
Страница 17: ...ESIE09 08A Specifications 5 Part 2 Specifications 1 Specifications 6 1 1 Outdoor Units 6 1 2 Indoor Unit 8 ...
Страница 28: ...Refrigerant Circuit ESIE09 08A 16 Refrigerant Circuit EKHBRD 011 014 016 AB AC V1 Y1 ...
Страница 38: ...Functional Parts Layout ESIE09 08A 26 Refrigerant Circuit 2 6 EKHTSU 200 260 A AB AC Front view Tank sensor ...
Страница 40: ...Functional Parts Layout ESIE09 08A 28 Refrigerant Circuit ...
Страница 63: ...ESIE09 08A PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 Refrigerant Circuit 51 ...
Страница 64: ...PCB Layout for EKHBRD 011 014 016 AA AB AC V1 Y1 ESIE09 08A 52 Refrigerant Circuit ...
Страница 125: ...ESIE09 08A Field Setting Test Operation 113 ...
Страница 232: ...Troubleshooting by Indication on the Remote Controller ESIE09 08A 222 Troubleshooting ...
Страница 237: ...ESIE09 08A Piping Diagrams Appendix 227 EKHBRD 011 014 016 AB AC V1 Y1 ...
Страница 250: ...Wiring Diagrams ESIE09 08A 240 Appendix EKHBRD 011 014 016 AB AC V1 ...
Страница 251: ...ESIE09 08A Wiring Diagrams Appendix 241 ...
Страница 256: ...Wiring Diagrams ESIE09 08A 246 Appendix EKHBRD 011 014 016 AB AC Y1 ...
Страница 257: ...ESIE09 08A Wiring Diagrams Appendix 247 ...
Страница 260: ...Wiring Diagrams ESIE09 08A 250 Appendix ...
Страница 266: ...Method of Replacing the Inverter s Power Transistors Modules ESIE09 08A 256 Appendix Inverter PC board C C W U V ...
Страница 288: ...3 Way Valve ESIE09 08A 278 Appendix ...