6 Commissioning
Installation manual
19
EBLQ+07CAV3
Daikin Altherma low temperature monobloc
4P403578-1C – 2016.02
INFORMATION
▪ To purge air, use all air purge valves present in the
system. This includes the manual air purge valve of the
outdoor unit, as well as any field-supplied valves.
▪ For the location of the manual air purge valve, see
"Components: Outdoor unit" in the installer reference
guide.
▪ If the system contains a backup heater, also use the air
purge valve of the backup heater. For the location of
this valve, refer to "Components: Backup heater" in the
installer reference guide.
▪ If the system contains valve kit EKMBHBP1, it is
required to – during the air purge – manually switch the
position of the valve kit's 3‑way valve by turning its
knob, this to prevent air from remaining in the bypass.
For more information, refer to the instruction sheet of
the valve kit.
6.2.2
To perform a test run
Prerequisite:
Make sure that the leaving water temperature home
page, room temperature home page, and domestic hot water home
page are turned OFF.
1
Set the user permission level to Installer. See
permission level to Installer" on page 12
.
2
Go to [A.7.1]:
> Installer settings > Commissioning > Test
run.
3
Select a test and press
.
Example:
Heating.
4
Select OK and press
.
Result:
The test run starts. It stops automatically when done
(±30 min). To stop it manually, press
, select OK and press
.
INFORMATION
When starting up the system in a cold climate, and NO
backup heater kit (EKMBUHCA3V3 or EKMBUHCA9W1)
was installed, it may be required to start up with a small
water volume. To do this, gradually open the heat emitters.
As a result, the water temperature will gradually rise.
Monitor the inlet water temperature ([6.1.6] in the menu
structure) and make sure it does NOT drop below 15°C.
INFORMATION
If 2 user interfaces are present, you can start a test run
from both user interfaces.
▪ The user interface used to start the test run displays a
status screen.
▪ The other user interface displays a "busy" screen. You
cannot use the user interface as long as the "busy"
screen is shown.
6.2.3
To perform an actuator test run
Prerequisite:
Make sure that the leaving water temperature home
page, room temperature home page, and domestic hot water home
page are turned OFF.
1
Set the user permission level to Installer. See
permission level to Installer" on page 12
.
2
Make sure the room temperature control, the leaving water
temperature control and the domestic hot water control are
turned OFF via the user interface.
3
Go to [A.7.4]:
> Installer settings > Commissioning >
Actuator test run.
4
Select an actuator and press
.
Example:
Pump.
5
Select OK and press
.
Result:
The actuator test run starts. It automatically stops when
finished. To stop it manually, press
, select OK and press
.
Possible actuator test runs
▪ Booster heater test
▪ Backup heater (step 1) test
▪ Backup heater (step 2) test
▪ Pump test
INFORMATION
Make sure that all air is purged before executing the test
run. Also avoid disturbances in the water circuit during the
test run.
▪ 2-way valve test
▪ 3-way valve test
▪ Bivalent signal test
▪ Alarm output test
▪ Cooling/heating signal test
▪ Quick heat-up test
▪ Circulation pump test
6.2.4
To perform an underfloor heating screed
dryout
Prerequisite:
Make sure there is ONLY 1 user interface connected
to your system to perform an underfloor heating screed dryout.
Prerequisite:
Make sure that the leaving water temperature home
page, room temperature home page, and domestic hot water home
page are turned OFF.
1
Go to [A.7.2]:
> Installer settings > Commissioning > UFH
screed dryout.
2
Set a dryout program.
3
Select Start dryout and press
.
4
Select OK and press
.
Result:
The underfloor heating screed dryout starts. It stops
automatically when done. To stop it manually, press
, select OK
and press
.
NOTICE
To perform an underfloor heating screed dryout, room frost
protection needs to be disabled ([2‑06]=0). By default, it is
enabled ([2‑06]=1). However, due to the "installer-on-site"
mode (see "Checklist before commissioning"), room frost
protection will be automatically disabled for 12 hours after
the first power-on.
If the screed dryout still needs to be performed after the
first 12 hours of power-on, manually disable room frost
protection by setting [2‑06] to "0", and KEEP it disabled
until the screed dryout has finished. Ignoring this notice will
result in cracking of the screed.
NOTICE
For the underfloor heating screed dryout to be able to start,
make sure the following settings are met:
▪ [4‑00]=1
▪ [C‑02]=0
▪ [D‑01]=0
▪ [4‑08]=0
▪ [4‑01]≠1