9
|
Electrical installation
Installer reference guide
117
EPRA08~W1 + ETBH/9W
Daikin Altherma 3 H MT W
4P634885-1 – 2021.03
B
C
A
A
B
C
A
A
M2S
NO
NC
C
5 6
X2M
C
21 28
X2M
C
5 6
X2M
C
21 29
X2M
B
X2M
3
Fix the cable with cable ties to the cable tie mountings.
9.3.4 To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A]
Energy metering
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X5M/6 and X5M/4; the negative polarity to X5M/5
and X5M/3.
1
Open the following (see
"7.2.5 To open the indoor unit"
1
Front panel
1
2
3
2
Switch box cover
3
Switch box
2
Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
Содержание Altherma 3 H MT W
Страница 294: ...13 13...
Страница 295: ......
Страница 296: ...4P634885 1 2021 03 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...