8
|
Piping installation
Installer reference guide
100
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
Without installed drainback solar kit (option)
1
Connect a hose with non-return valve (1/2") to the drainback connection.
2
Fill the storage tank until water spills from the spillover connection.
3
Remove the hose.
b
a
a
c
b
a
Drainback connection
b
Spillover connection
c
Hose with non-return valve (1/2")
With installed drainback solar kit (option)
1
Combine the fill and drain kit (option) with the drainback solar kit (option) to
fill the storage tank.
2
Connect the hose with non-return valve to the fill and drain kit.
Follow the steps described in the previous chapter.
Содержание Altherma 3 H MT ECH2O
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...