
7
|
Unit installation
Installer reference guide
78
EPRA14~18D + ETV23E
Daikin Altherma 3 H HT F
4P644738-1A – 2022.03
NOTICE
O-ring.
Make sure the O-ring is installed correctly to prevent leakage.
7.3.6 To install the discharge grille
INFORMATION
Electrical wiring.
Before installing the discharge grille, connect the electrical wiring.
Install the lower part of the discharge grille
1
Insert the hooks.
2
Insert the ball studs.
1
2
3
Fix the 2 lower screws.
3
2×
5 N•m
Install the upper part of the discharge grille
NOTICE
Vibrations.
Make sure the upper part of the discharge grille is attached seamlessly to
the lower part to prevent vibrations.
4
Align and attach the left side.
5
Align and attach the middle part.
6
Align and attach the right side.
Содержание Altherma 3 H HT F
Страница 297: ...13 13 ...
Страница 298: ......
Страница 299: ......
Страница 300: ...4P644738 1A 2022 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...