background image

8 Commissioning

Installation manual

26

EA23DA6V(7)+9W

Daikin Altherma 3 H F

4P556073-1A – 2021.09

7

Read out the flow rate and modify the bypass valve
setting to reach the minimum required flow rate + 2 l/
min.

Minimum required flow rate

20 l/min

8.2.2

To perform an air purge

Conditions: 

Make  sure  all  operation  is  disabled.  Go  to  [C]:

Operation

  and  turn  off 

Room

Space  heating/cooling

  and 

Tank

operation.

1

Set the user permission level to Installer. See 

"To

change the user permission level"

 [

4

 16].

2

Go to [A.3]: 

Commissioning

 > 

Air purge

.

3

Select 

OK

 to confirm.

Result: 

The air purge starts. It stops automatically

when air purge cycle is finished.

To stop the air purge manually:

1

Go to 

Stop air purge

.

2

Select 

OK

 to confirm.

INFORMATION

When  air  purging  in  automatic  mode,  the  first  air  purge  is
always  for  the  main  zone,  the  second  started  air  purge  is
always  for  the  additional  zone.  To  air  purge  the  domestic
hot water tank circuit, choose [A.3.1.5.2] 

Circuit

=

Tank

 at

the  start  of  the  manual  air  purge  of  the  main  zone  or
additional zone.

8.2.3

To perform an operation test run

Conditions: 

Make  sure  all  operation  is  disabled.  Go  to  [C]:

Operation

  and  turn  off 

Room

Space  heating/cooling

  and 

Tank

operation.

INFORMATION

The  test  run  only  applies  to  the  additional  temperature
zone.

1

Set the user permission level to 

Installer

. See 

"To

change the user permission level"

 [

4

 16].

2

Go to [A.1]: 

Commissioning

 > 

Operation test

run

.

3

Select a test from the list. 

Example: 

Heating

.

4

Select 

OK

 to confirm.

Result: 

The test run starts. It stops automatically

when ready (±30 min).

To stop the test run manually:

1

In the menu, go to 

Stop test run

.

2

Select 

OK

 to confirm.

INFORMATION

If  the  outdoor  temperature  is  outside  the  range  of
operation,  the  unit  may  NOT  operate  or  may  NOT  deliver
the required capacity.

To monitor leaving water and tank temperatures

During test run, the correct operation of the unit can be checked by
monitoring its leaving water temperature (heating/cooling mode) and
tank temperature (domestic hot water mode).

To monitor the temperatures:

1

In the menu, go to 

Sensors

.

2

Select the temperature information.

8.2.4

To perform an actuator test run

Conditions: 

Make  sure  all  operation  is  disabled.  Go  to  [C]:

Operation

  and  turn  off 

Room

Space  heating/cooling

  and 

Tank

operation.

Purpose

Perform an actuator test run to confirm the operation of the different
actuators.  For  example,  when  you  select 

Pump

,  a  test  run  of  the

pump will start.

1

Set the user permission level to Installer. See 

"To

change the user permission level"

 [

4

 16].

2

Go to [A.2]: 

Commissioning

 > 

Actuator test run

.

3

Select a test from the list. 

Example: 

Pump

.

4

Select 

OK

 to confirm.

Result: 

The actuator test run starts. It stops

automatically when ready (±30 min).

To stop the test run manually:

1

In the menu, go to 

Stop test run

.

2

Select 

OK

 to confirm.

8.2.5

Possible actuator test runs

Backup heater 1

 test

Backup heater 2

 test

Pump

 test

INFORMATION

Make  sure  that  all  air  is  purged  before  executing  the  test
run. Also avoid disturbances in the water circuit during the
test run.

Shut off valve

 test

Diverter  valve

  test  (3-way  valve  for  switching  between  space

heating and tank heating)

Bivalent signal

 test

Alarm output

 test

C/H signal

 test

DHW pump

 test

8.2.6

To perform an underfloor heating screed
dryout

Conditions: 

Make  sure  all  operation  is  disabled.  Go  to  [C]:

Operation

  and  turn  off 

Room

Space  heating/cooling

  and 

Tank

operation.

1

Set the user permission level to Installer. See 

"To

change the user permission level"

 [

4

 16].

2

Go to [A.4]: 

Commissioning

 > 

UFH screed dryout

.

3

Set a dryout program: go to 

Program

 and use the

UFH screed dryout programming screen.

4

Select the zone where you want to perform the UFH
screed dryout program: go to the 

Zone selection

screen.

5

Select 

OK

 to confirm.

Result: 

The underfloor heating screed dryout starts.

It stops automatically when done.

To stop the test run manually:

1

Go to 

Stop UFH screed dryout

.

2

Select 

OK

 to confirm.

Содержание Altherma 3 H F

Страница 1: ...Installation manual Daikin Altherma 3 H F English Installation manual Daikin Altherma 3 H F EAVZ16S18DA6V 7 EAVZ16S23DA6V 7 EAVZ16S18DA9W EAVZ16S23DA9W...

Страница 2: ...souladu s na imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m u skladu sa slijede im standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s na i...

Страница 3: ...ge 17 7 2 2 Configuration wizard Time and date 17 7 2 3 Configuration wizard System 17 7 2 4 Configuration wizard Backup heater 18 7 2 5 Configuration wizard Main zone 19 7 2 6 Configuration wizard Ad...

Страница 4: ...iping installation 48 WARNING Field piping method MUST be in accordance with the instructions from this manual See 5 Piping installation 48 WARNING Ethylene glycol is toxic WARNING Due to the presence...

Страница 5: ...heater 4 1 1 Installation site requirements of the indoor unit The indoor unit is designed for indoor installation only and for the following ambient temperatures Space heating operation 5 30 C Space...

Страница 6: ...ng cases 4 2 2 To lower the switch box on the indoor unit 46 4 3 2 To connect the drain hose to the drain 47 When you need access to the high voltage switch box 2 T25 5 If you need access to the high...

Страница 7: ...hose to the drain See 4 3 2 To connect the drain hose to the drain 47 3 Slide the indoor unit into position 4 Adjust the height of the leveling feet to compensate for floor irregularities The maximum...

Страница 8: ...ntrolled valves it is important that the minimum flow rate is guaranteed even if all valves are closed In case the minimum flow rate cannot be reached a flow error 7H will be generated no heating or o...

Страница 9: ...en All automatic air purge valves MUST remain open after commissioning 5 2 4 To protect the water circuit against freezing About freeze protection Frost can damage the system To prevent the hydraulic...

Страница 10: ...e maximum allowed water volume Adding glycol to the water circuit reduces the maximum allowed water volume of the system For more information see the installer reference guide topic To check the water...

Страница 11: ...mA b Field supplied components 11 Shut off valve 2 100 mA b 12 Electricity meter 2 per meter b 13 Domestic hot water pump 2 b 14 Alarm output 2 b 15 Changeover to external heat source control 2 b Item...

Страница 12: ...ables 6 3 3 To connect the main power supply 1 Connect the main power supply In case of normal kWh rate power supply X1M X2M X5M A5P X11YB X1A 1 2 3 1 2 3 a X11Y X11YA 1 2 3 a Interconnection cable ma...

Страница 13: ...l Technical Standard setting the limits for voltage changes voltage fluctuations and flicker in public low voltage supply systems for equipment with rated current 75 A provided that the system impedan...

Страница 14: ...to the appropriate terminals as shown in the illustration below X1M X2M X5M 1 M M2P 1 2 2 Fix the cable with cable ties to the cable tie mountings 6 3 8 To connect the alarm output 1 Connect the alar...

Страница 15: ...is too high the contact will open and the user interface will show a 8H 02 error ONLY the main pump will stop Additional zone 3 Connect the safety thermostat normally closed cable to the appropriate...

Страница 16: ...access the installer settings using two different methods However NOT all settings are accessible via both methods If so the corresponding table columns in this chapter are set to N A not applicable...

Страница 17: ...r interface For units with a built in backup heater the type of heater can be viewed but not changed Code Description 9 3 1 E 03 3 6V 4 9W Domestic hot water The following setting determines if the sy...

Страница 18: ...European electricity grids If the backup heater is available the voltage configuration and capacity must be set on the user interface The capacities for the different steps of the backup heater must...

Страница 19: ...55 C Variable 1 Fancoil unit Maximum 55 C Variable 2 Radiator Maximum 65 C Fixed 8 C NOTICE Average emitter temperature Leaving water temperature Delta T 2 This means that for a same leaving water te...

Страница 20: ...the scheduled heat up cycles reheat operation is allowed 2 Schedule only The domestic hot water tank can ONLY be heated according to a schedule See the operation manual for more details Comfort setpoi...

Страница 21: ...curves 422 7 3 2 2 points curve Define the weather dependent curve with these two setpoints Setpoint X1 Y2 Setpoint X2 Y1 Example Y1 Y2 X1 X2 a Item Description a Selected weather dependent zone Main...

Страница 22: ...g Go to setpoint mode Set the setpoint mode to 3 4 Additional zone Setpoint mode WD heating fixed cooling OR Weather dependent Additional zone Cooling 3 4 Additional zone Setpoint mode Weather depende...

Страница 23: ...at indoor unit b External room thermostat at main zone c External room thermostat at additional zone NOTICE If an external room thermostat is used the external room thermostat will control the room f...

Страница 24: ...2 Capacity step 1 Equilibrium Equilibrium temperature Operation 9 6 Balancing Space heating priority Priority temperature Offset BSH setpoint Minimum running timer Anti recycle timer Maximum running t...

Страница 25: ...oltage on the identification label of the unit There are NO loose connections or damaged electrical components in the switch box There are NO damaged components or squeezed pipes on the inside of the...

Страница 26: ...correct operation of the unit can be checked by monitoring its leaving water temperature heating cooling mode and tank temperature domestic hot water mode To monitor the temperatures 1 In the menu go...

Страница 27: ...result in cracking of the screed NOTICE For the underfloor heating screed dryout to be able to start make sure the following settings are met 4 00 1 C 02 0 D 01 0 4 08 0 4 01 1 9 Hand over to the user...

Страница 28: ...rew connection 1 p Water filter main mixed zone b1 Space heating main mixed zone Water IN screw connection 1 q Loose nut 1 b2 Space heating main mixed zone Water OUT screw connection 1 B1L Flow sensor...

Страница 29: ...n OFF thermostat wireless On OFF thermostat wireless Ext thermistor External thermistor Heat pump convector Heat pump convector Position in switch box English Translation Position in switch box Positi...

Страница 30: ...ad Maximum load Normally closed Normally closed Normally open Normally open Safety thermostat Safety thermostat English Translation Safety thermostat contact 16 V DC detection voltage supplied by PCB...

Страница 31: ...uded signal A13P P1 P2 LAN adapter A14P P1 P2 user interface communication 2 core communication 2 core 4 core 5 core for C H operation 4 core for H only operation 3 core for C H operation 2 core for H...

Страница 32: ...4P556073 1A 2021 09 Copyright 2018 Daikin 4P556073 1 A 0000000 Verantwortung f r Energie und Umwelt...

Отзывы: