S0205015K
Page 21
Specifications for Solar 225LC-V
Return to Master Table of Contents
CYLINDER PERFORMANCE TESTS
NOTE:
All tests are performed with standard boom, arm and bucket configuration. The bucket
should be empty.
Boom Cylinders Test
The starting points for the test are with the boom and arm extended away from the excavator, and the
bucket curled inward. The arm cylinder should be fully retracted; boom and bucket cylinders must be
extended. Test movement in both directions, several times, and average results for both Standard Mode
and Power Mode.
Arm Cylinder Test
Start with the boom up and the arm cylinder fully retracted. Test movement in both directions several times,
between the "crowd" and "dump" positions, and average the results of both tests, in both standard and
extra-duty power modes.
Bucket Cylinder Test
Start with the boom up and the teeth of the bucket hanging vertically, 500 mm (1-1/2’ - 2’) above the
ground. Dump and crowd the bucket several times, and average results, for both standard and extra-duty
power modes.
Hydraulic Cylinder Natural Drop Test
To check boom and arm cylinder tightness against the specified performance standard for new cylinders,
put a full load of dirt in the bucket and move the attachment cylinders so that the arm cylinder is extended
20 - 50 mm (1" - 2") and boom cylinders are retracted the same amount, 20 - 50 mm (1" - 2"). The top of
the bucket should be approximately 2 m (6' - 7') off the ground.
Turn off the engine and measure cylinder drop after 5 minutes. Bucket cylinder should not show more than
40 mm (1.57") change, while the arm and boom cylinders should not fall more than 10 mm (0.39").
Travel Motor Jack-up Test
Test travel motor operation on each side by painting or chalking a mark on one crawler shoe, with a
corresponding mark on the travel frame. Use the attachment to jack up one side of the machine and
operate the raised travel motor. Record the number of seconds it takes the crawler shoe to make 3 full
rotations, during both high speed and low speed operation.
OPERATION
STANDARD MODE
POWER MODE
Boom Up
2.9 -3.7 seconds
2.6 - 3.4 seconds
Boom Down
2.2 - 2.8 seconds
1.9 - 2.7 seconds
Arm Dump
2.4 - 3.0 seconds
2.2 - 3.1 seconds
Arm Crowd
3.3 - 4.1 seconds
3.1 - 3.9 seconds
Bucket Dump
2.1 - 2.7 seconds
1.9 - 2.7 seconds
Bucket Crowd
3.5 - 4.3 seconds
3.2 - 4.0 seconds
OPERATION
STANDARD MODE
POWER MODE
High Speed
18.0 - 21.0 seconds
17.3 - 18.7 seconds
Low Speed
33.0 - 37.0 seconds
31.8 - 34.2 seconds
Содержание Solar 225LC-V
Страница 2: ......
Страница 4: ......
Страница 7: ...1SAFETY ...
Страница 8: ......
Страница 46: ...S0102000 Page 38 Track Excavator Safety ...
Страница 47: ...1SPECIFICATIONS ...
Страница 48: ......
Страница 54: ...S0205015K Page 6 Specifications for Solar 225LC V Return to Master Table of Contents ...
Страница 70: ...S0205015K Page 22 Specifications for Solar 225LC V Return to Master Table of Contents ...
Страница 71: ...1GENERAL MAINTENANCE ...
Страница 72: ......
Страница 86: ...S0302000 Page 14 General Maintenance Procedures ...
Страница 99: ...1UPPER STRUCTURE ...
Страница 100: ......
Страница 102: ...S0402040K Page 2 Cab TABLE OF CONTENTS Removal 3 Installation 6 ...
Страница 110: ...S0403050K Page 2 Counterweight Return to Master Table of Contents TABLE OF CONTENTS General 3 Removal 5 Installation 7 ...
Страница 116: ...S0403050K Page 8 Counterweight Return to Master Table of Contents ...
Страница 140: ...S0407000 Page 6 Swing Bearing ...
Страница 165: ...1LOWER STRUCTURE AND CHASSIS ...
Страница 166: ......
Страница 190: ...S0505030 Page 24 Track Assembly Return to Master Table of Contents 7 Tighten plug 1 Figure 49 Figure 49 ...
Страница 192: ...S0505030 Page 26 Track Assembly Return to Master Table of Contents ...
Страница 193: ...1ENGINE AND DRIVE TRAIN ...
Страница 194: ......
Страница 205: ...S0605060K Page 11 Air Conditioner Face and Defroster ARS1300L Figure 12 ...
Страница 229: ...S0609000 Page 9 Drive Coupling Main Pump Figure 10 DRIVE COUPLING INSTALLATION UCHIDA PUMP ...
Страница 234: ...S0609000 Page 14 Drive Coupling Main Pump ...
Страница 235: ...1HYDRAULICS ...
Страница 236: ......
Страница 249: ...S0702170K Page 13 Hydraulic System Troubleshooting Testing and Adjustment ...
Страница 272: ...S0702170K Page 36 Hydraulic System Troubleshooting Testing and Adjustment ...
Страница 274: ...S0703010K Page 2 Accumulator TABLE OF CONTENTS General Description 3 Specifications 4 ...
Страница 297: ...S0705000 Page 9 Cylinders ...
Страница 301: ...S0705000 Page 13 Cylinders ...
Страница 311: ...S0705000 Page 23 Cylinders ...
Страница 312: ...S0705000 Page 24 Cylinders SLIPPER SEAL JIG ARS4770L A 2 A A 14 B B 40 5 R 1 0 R1 1 0 Figure 10 ...
Страница 315: ...S0705000 Page 27 Cylinders ...
Страница 316: ...S0705000 Page 28 Cylinders SLIPPER SEAL STRAIGHTENING JIG ARS4780L 2 R1 50 25 100 A 15 A 2 5 R 2 C 1 Figure 11 ...
Страница 324: ...S0705000 Page 36 Cylinders 17 Force out pin bushing 1 from body of cylinder Figure 28 ...
Страница 328: ...S0705000 Page 40 Cylinders ...
Страница 335: ...S0707200 Page 7 Swing Motor Return to Master Table of Contents ...
Страница 336: ...S0707200 Page 8 Swing Motor Return to Master Table of Contents PARTS LIST Model Solar 250LC V 255LC V Figure 4 ...
Страница 341: ...S0707200 Page 13 Swing Motor Return to Master Table of Contents SPECIAL TOOLS Figure 6 ...
Страница 358: ...S0707200 Page 30 Swing Motor Return to Master Table of Contents ...
Страница 368: ...S0707330 Page 10 Travel Motor With Gearbox GM35VL Return to Master Table of Contents TRAVEL MOTOR PARTS LIST Figure 12 ...
Страница 424: ...S0708320 Page 12 Main Pump With Regulator Return to Master Table of Contents PARTS LIST Main Pump Figure 13 ...
Страница 426: ...S0708320 Page 14 Main Pump With Regulator Return to Master Table of Contents Pump Regulator Figure 14 ...
Страница 432: ...S0708320 Page 20 Main Pump With Regulator Return to Master Table of Contents Model SOLAR 225LC V BBS0030L Figure 16 ...
Страница 452: ...S0708320 Page 40 Main Pump With Regulator Return to Master Table of Contents ...
Страница 458: ...S0709401K Page 6 Main Control Valve Kayaba Figure 1 ...
Страница 459: ...S0709401K Page 7 Main Control Valve Kayaba Figure 2 ...
Страница 461: ...S0709401K Page 9 Main Control Valve Kayaba ...
Страница 463: ...S0709401K Page 11 Main Control Valve Kayaba Figure 4 ...
Страница 475: ...S0709401K Page 23 Main Control Valve Kayaba Figure 16 ...
Страница 508: ...S0709401K Page 56 Main Control Valve Kayaba Figure 54 ...
Страница 558: ...S0792105K Page 4 Hydraulic Schematic Solar 225LC V 225NLC V Return to Master Table of Contents SOLAR 225LC V Figure 2 ...
Страница 559: ...S0792105K Page 5 Hydraulic Schematic Solar 225LC V 225NLC V Return to Master Table of Contents BBS0070L SOLAR 225LC V ...
Страница 560: ...S0792105K Page 6 Hydraulic Schematic Solar 225LC V 225NLC V Return to Master Table of Contents SOLAR 225NLC V Figure 3 ...
Страница 561: ...S0792105K Page 7 Hydraulic Schematic Solar 225LC V 225NLC V Return to Master Table of Contents BDS0110L SOLAR 225NLC V ...
Страница 562: ...S0792105K Page 8 Hydraulic Schematic Solar 225LC V 225NLC V Return to Master Table of Contents ...
Страница 563: ...1ELECTRICAL SYSTEM ...
Страница 564: ......
Страница 618: ...S0802220K Page 54 Electrical System ...
Страница 637: ...S0802220K Page 73 Electrical System ...
Страница 644: ...S0892105K Page 4 Electrical Schematic Solar 225LC V 225NLC V Return to Master Table of Contents SOLAR 225LC V Figure 2 ...
Страница 647: ...S0892105K Page 7 Electrical Schematic Solar 225LC V 225NLC V Return to Master Table of Contents BDS0190L S225NLC V ...
Страница 648: ...S0892105K Page 8 Electrical Schematic Solar 225LC V 225NLC V Return to Master Table of Contents ...
Страница 649: ...1ATTACHMENTS ...
Страница 650: ......
Страница 665: ...S0904015K Page 7 Bucket 5 Roll the new O ring 1 Figure 9 into the O ring groove BBO0022L 1 Figure 9 ...
Страница 670: ......