79
Precautions
Items
4) Refrigerant Charging
Charge refrigerant while operating a compressor as shown above.
5) Pinch a charging pipe with a pinch-off plier after completion of charging.
6) Braze the end of a pinched charging pipe with copper brazer and take
a gas leakage test on the welded parts.
4.Refrigerant charging.
Bombe
Compressor
Evaporator
Condenser
Dryer
Hot Pipe
* Take a leakage test on the welded or suspicious area with an
electronic leakage tester.
5. Gas-leakage test
* Check each pipe is placed in its original place before closing
a cover back-M/C after completion of work.
6. Pipe arrangement
in each cycle
10-4. Standard Regulations for Heavy Repair
1) Observe the safety precautions for gas handling.
2) Use JIG (or wet towel) in order to prevent electric wires from burning during welding.
(In order to prevent insulation break and accident.)
3) The inner case shall be melted and insulation material (polyurethane) shall be burnt
if not cared during welding inner case parts.
4) The copper pipe shall be oxidized by overheating if not cared during welding.
5) Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)
6) Make sure that the inner diameter should not be distorted while cutting a capillary tube.
7) Be sure that a suction pipe and a filling tube should not be substituted each other during welding.
( High efficiency pump.)
Содержание FRS(N)-U20IA
Страница 4: ...3 2 EXTERNAL VIEWS 2 1 External Size FRS N U20IA...
Страница 5: ...4 FRS N U20DA FRS N U20EA...
Страница 6: ...5 FRS N U20FA FRS N U20GA...
Страница 41: ...40 6 1 Wiring Diagram 6 DIAGRAM FRS N U20IA...
Страница 42: ...41 FRS N U20DA EA FA GA...
Страница 43: ...42 6 2 Circuit Diagram of Main PCB FRS N U20IA...
Страница 44: ...43...
Страница 45: ...44 FRS N U20DA EA FA GA...
Страница 46: ...45...
Страница 88: ...87 11 5 Dispenser Water Flow...
Страница 89: ...88 CABINET 12 1 FRS N U20IA 12 EXPLODED VIEW PARTS LIST...
Страница 90: ...89 MECH ROOM...
Страница 91: ...90 R ROOM...
Страница 92: ...91 F ROOM...
Страница 93: ...92 F DOOR...
Страница 94: ...93 R DOOR...
Страница 99: ...98 CABINET 12 2 FRS N U20DA...
Страница 100: ...99 MECH ROOM...
Страница 101: ...100 R ROOM...
Страница 102: ...101 F ROOM...
Страница 103: ...102 F DOOR...
Страница 104: ...103 R DOOR...
Страница 110: ...109 CABINET 12 3 FRS N U20EA...
Страница 111: ...110 MECH ROOM...
Страница 112: ...111 R ROOM...
Страница 113: ...112 F ROOM...
Страница 114: ...113 F DOOR...
Страница 115: ...114 R DOOR...
Страница 121: ...120 CABINET 12 4 FRS N U20FA...
Страница 122: ...121 MECH ROOM...
Страница 123: ...122 R ROOM...
Страница 124: ...123 F ROOM...
Страница 125: ...124 F DOOR...
Страница 126: ...125 R DOOR...
Страница 132: ...131 CABINET 12 5 FRS N U20GA...
Страница 133: ...132 MECH ROOM...
Страница 134: ...133 R ROOM...
Страница 135: ...134 F ROOM...
Страница 136: ...135 F DOOR...
Страница 137: ...136 R DOOR...
Страница 143: ...686 AHYE ON DONG MAPO GU S E OUL KOR E A C P O BOX 8003 S E OUL KOR E A PRINTED DATE JULY 2005 DAEWOO ELECTRONICS CORP...