30
22-
-33.. S
Sppiinn S
Seeqquueennccee
1) Drain
① It follows Drainage Sequence.
2) Balance Spin
① If Unbalance Check pass, Start R-Spin.
② B-Spin is Until Unbalance check section, 350 r.p.m
3) R(Real) Spin
① From end of B-Spin to end of Spin Sequence is R Spin.
② r.p.m is affected by sequence
4) Shoes Spin
① Balace Spin does not working.
22-
-44.. E
Enndd
1) Crease Care
① Crease Care is process of removal laundry that stick to drum. It works 30sec ,after Spin Sequence.
② Wool and Shoes course don't work crease care
2) End
① After 10 sec power off ,alamed END.
② If drying sequence added, work drying sequence.
③ After END , door unlock.
Содержание DWD-T120R
Страница 15: ...13 3 CABINET F ASSY ...
Страница 17: ...15 4 CABINET ASSY ...
Страница 19: ...17 5 BASE U AS ...
Страница 21: ...19 6 TUB ASSY ...
Страница 23: ...21 7 DUCT B AS DUCT PIPE AS G01 G02 ...
Страница 68: ...64 1 Structure of BLDC Motor 7 HEATER BLDC MOTOR 2 Power Transmission System of BLDC Motor ...
Страница 70: ...66 8 WIRINGDIAGRAM ...