4) Pre-stroke actuator adjustment
(1) Adjustment checker (including control unit)
This control unit is used especially for adjustment of TICS pumps. In addition to the control
unit, a constant voltage power supply and a digital voltmeter(both commercially available)
are necessary.
The figure below shows the names and functions of each control panel switch, dial and ter-
minal.
- 124 -
EA2M4011
Key no
Name
Remarks
1
Power switch
Used to turn the checker’s power ON add Off
2
Pilot lamp
3
Target dial
Used to set the pre-stroke actuator’s output voltage
4
Actuator operation switch
Switch to ‘Normal’ when operating the actuator,
and ‘Act-OFF’ when not operating the actuator
5
Rack sensor output terminals
Used to connect the racd sensor to the digital voltmeter
6
Ps actuator output terminals
Used to connect the Ps actuator output terminals
7
5 Volt output terminals
Not used at present
8
Fuse