34
English
Installation Instructions
Moving the Range For Service
1. Close the gas-supply valve.
2. Turn off power to the range at the circuit breaker or fuse box.
3.
Pull the range out of the cutout.
4. Push the range back into place, being sure to engage the anti-tip bracket (Pg. 29).
5.
Turn on power to the range at the circuit breaker or fuse box.
6.
Open the gas-supply valve.
Installation Checklist
Installer
Complete this checklist to ensure that no part of the installation was overlooked.
Owner
You are ultimately responsible for ensuring that the installation was performed properly by a qualified techni
-
cian. Dacor is not responsible for property damage or product failure due to improper installation of the range.
F
Was the plastic coating been peeled off the outside of the range?
F
Were all packaging materials removed from the oven chamber?
F
Were the leveling legs lowered to the floor and the unit leveled? (Pg. 27)
F
Was the range secured with the provided anti-tip bracket and foot? (Pgs. 17–21, 27)
F
Was the range wired/grounded and the electrical-access cover re-attached? (Pgs. 21–25)
F
Was the gas-supply inlet pressure adjusted within the stated maximum? (Pg. 16)
F
Was the range connected to the gas supply and gas-leak tests conducted? (Pg. 26)
F
Was the oven door re-attached? (Pg. 27)
F
Were the burner knobs installed? (Pg. 28)
F
Were the burner components and grates installed? (Pg. 28)
F
Was proper operation verified? (Pg. 30)
F
Was the warranty activated on-line or the warranty card (see the User Manual) completed and mailed?
Содержание HDPR48S
Страница 9: ...9 English Product Specifications HDPR30S 36S 48S Ranges HDPR48S HDPR36S HDPR30S ...
Страница 10: ...10 English Product Specifications HDER30S 36S 48S Ranges HDER48S HDER36S HDER30S ...
Страница 35: ...35 English Notes ...
Страница 36: ...Dacor 14425 Clark Avenue City of Industry CA 91745 Phone 800 793 0093 Fax 626 403 3130 www dacor com ...