background image

ENGLISH 

 42 
 

 

Do not drive vehicles over the cover (see fig. 3). Fekabox / Fekafos: the cover can bear 
passing loads of 100 kg if installed underground. 

You can close the ditch with a cover (manhole) or other means for facilitating subsequent maintenance. Put 
up suitable signals indicating the presence of the station so as to avoid possible damage caused 
unintentionally. Ensure that there is sufficient space for installation and maintenance around and above the 
lifting station. 
 

 

Position any capacitor holder and/or electric control panel in a place sheltered from the 
elements.  
 

After having completed the hydraulic and electric connection, it is recommended to place clean sand around 
the container to reduce any movements caused by the system and/or by the surrounding terrain. 

 

5.3  Making holes for the collection and ventilation pipes 

Choose the inlet duct already prepared for the inlet pipe so that the arrival of the liquid does not disturb the 
operation of the floats (of both the pump and the tank, if provided). 
The Fekabox-Fekafos tanks have multiple inlets, all marked with the symbol: 

 

 

Make a hole in the tank in the determined areas, indicated by the symbols shown above. 
To make the hole use a hollow cutter as shown in figure 5 (indicative figure) with the correct diameter to suit 
the diameter of the input pipe. 
 
 
 
 
 

 

 
 
 
 
 

5.4  Gluing the collection and ventilation pipes 

Before gluing the PVC pipe must be deburred and cleaned with a suitable solvent on the whole surface 
where the glue will be applied. 
To ensure that it sticks firmly, the glue must be applied on the whole newly deburred surface, at least for a 
complete round. 

 

Attention: 

Use glue suitable for sticking PVC materials with PE (for example: Simson ISR 70-03) 

Also check the drying times indicated in the specific instructions for the glue used. 
For the discharge pipe 2”PP (Fekabox 200) use the multifibre nylon sealant Loctite 55, the polymerising GEI 
sealant Loctite 5331 or Teflon. For the steel pipe znb 2” (Fekabox 200, Fekafos 280, Fekafos 280 Double, 
Fekafos 550 Double) and the other inlet connections use the most suitable glue in accordance with the 
standards of the local market. 
 
 
 
 
 
 
 
 
 
 
 
 

Tank model 

Inlet 

diameter 

Ventilation 

diameter 

Emergency 

 discharge  

diameter

 

Fekabox 200 

DN50 DN50 

DN 40 

DN110 - 

Fekafos 280 

DN50 DN50 

DN110 - 

Fekafos 550 

Double 

DN50 DN50 

DN110 - 

Fig. 5 

 

Glue 

30-40 mm 

Содержание FEKABOX 200

Страница 1: ...ONSANWEISUNG UND WARTUNG INSTRUCTIES VOOR INGEBRUIKNAME EN ONDERHOUD INSTRUCCIONES PARA LA INSTALACION Y EL MANTENIMIENTO N VOD K INSTALACI A DR B INSTRUKCJA MONTA U I KONSERWACJI KURMA VE BAKIM B LG...

Страница 2: ...onnecting the delivery pipe to the sewer network 43 5 6 Connecting the ventilation pipe 43 5 7 Closing the cover 43 5 8 Provision for emergency drainage 44 5 9 Non return valve 44 5 10 Interception ga...

Страница 3: ...pliance by a person responsable for their safety Children should be supervised to ensure that they do not play with the appliance 1 3 Check that the system has suffered no damage during transport or s...

Страница 4: ...he level of the sewer network In compliance with the accident prevention regulations in force the FEKABOX FEKAFOS cannot be used for conveying inflammable or explosive liquids such as petrol diesel fu...

Страница 5: ...4 1 Dimensions and weights The adhesive label on the package indicates the total weight of the system The dimensions below are given in millimetres Only for Fekabox 200 Fekafos 280 280 Double Fekafos...

Страница 6: ...se the surface on which it is laid must be perfectly horizontal and it must be ensured that the whole bottom of the tank is in contact with the surface For Fekabox 200 l Fekabox 280 and Fekabox 550 Do...

Страница 7: ...rked with the symbol Make a hole in the tank in the determined areas indicated by the symbols shown above To make the hole use a hollow cutter as shown in figure 5 indicative figure with the correct d...

Страница 8: ...gases cannot get into other places such as buildings rooms and similar Avoid horizontal stretches in the ventilation duct 5 7 Closing the cover Check that the gasket of the cover is lying in the botto...

Страница 9: ...public private sewer network This will avoid the reflux of liquid Place the valve at a distance of at least 1 metre from the lifting station to allow the flow of liquid moved by the pump to open the s...

Страница 10: ...therefore intended for only one automatic single phase pump with float 20Kg A Remove the tank cover B Extract the slide 3 from the coupling foot 5 C For FEKA 600 screw the special 2 F 1 1 4 M couplin...

Страница 11: ...ENGLISH 46 FEKABOX 200 l PREPARED FOR THE FOLLOWING PUMPS FEKABOX 200 FEKA 600 MA FEKA VS VX 550 MA FEKA VS VX 750 MA FEKA VS VX 1000 MA FEKA VS VX 1200 MA FEKA VS Fig 8A Fig 8B FEKA 600 Fig 8 FEKA VX...

Страница 12: ...the top screw from the flange on the delivery side 1 Assemble the anti rotation bracket 2 Replace the screw 1 Extract the slide from the coupling foot 5 and connect it to the delivery port of the pump...

Страница 13: ...R 1800 T GRINDER 1000 1200 1600 MNA TNA FEKA 2015 2 MNA TNA 2025 2 2030 2 TNA PREPARED FOR THE FOLLOWING PUMPS FEKAFOS 280 DOUBLE FEKA VS VX 550 MNA TNA FEKA VS VX 750 MNA TNA FEKA VS VX 1000 MNA TNA...

Страница 14: ...OS 550 DOUBLE FEKA VS VX 550 MNA TNA FEKA VS VX 750 MNA TNA FEKA VS VX 1000 MNA TNA FEKA VS VX 1200 MNA TNA FEKA GRINDER 1400 M FEKA GRINDER 1800 T GRINDER 1000 1200 1600 MNA TNA FEKA 2015 2 MNA TNA 2...

Страница 15: ...he Dab Assistance Service for the commissioning of the system For connecting the system it is recommended to use exclusively the panels ED E BOX indicated by the manufacturer supplied complete with de...

Страница 16: ...n the ring nut and connect the cable to the control panel as indicated in the respective manual taking care that the terminals on the panel correspond to the respective float cables TWO FLOATS THREE F...

Страница 17: ...to check the operation of the alarm system Make a test of the complete system with clean water checking that the alarm system intervenes only in the case of a pump malfunction or lack of power in the...

Страница 18: ...ck that the system is working correctly and put it into service Close the cover or covers of the station screwing them into place If necessary fix the cover in its seat in such a way as to prevent una...

Страница 19: ...e grille is blocked G The impeller is worn or blocked by foreign bodies A Remove the obstructions B Check that the pump slide is at its full limit only for 280 l tanks C Clean the valve D Open the val...

Отзывы: