background image

ENGLISH

 

25 

4.   EXAMPLE OF INSTALLATION 

FEKABOX 110 are preassembled systems, ready for installation, requiring no adjustment, ideal for collecting 
and  disposing  of  sewage and  domestic  waste  water  from  basement  rooms, situated  below  the  level  of  the 
sewer  network.  In  compliance  with  the  accident-prevention  regulations  in  force,  the  FEKABOX  110  cannot 
be  used  for  conveying  inflammable  or  explosive  liquids,  such  as  petrol,  diesel  fuel,  combustible  oils, 
solvents, etc. 

1 - Interception ball or gate valve 

4 - Ventilation 

2 - Delivery 

5 - Collecting pipe 

3 - Siphon 

6 - No Return Valve 

4

2

1

6

3

5

Fig. 1 

Fig. 2 

Fig. 3

Содержание FEKABOX 110 Series

Страница 1: ...AINTENANCE INSTALLATIONSANWEISUNG UND WARTUNG INSTRUCTIES VOOR INGEBRUIKNAME EN ONDERHOUD INSTRUCCIONES PARA LA INSTALACION Y EL MANTENIMIENTO N VOD K INSTALACI A DR B INSTRUKCJA MONTA U I KONSERWACJI...

Страница 2: ...for the collection delivery and ventilation pipes 27 5 4 Gluing the collection and ventilation pipes 28 5 5 Connecting the delivery pipe to the sewer network 28 5 6 Connecting the ventilation pipe 28...

Страница 3: ...e appliance by a person responsable for their safety Children should be supervised to ensure that they do not play with the appliance 1 3 Check that the system has suffered no damage during transport...

Страница 4: ...basement rooms situated below the level of the sewer network In compliance with the accident prevention regulations in force the FEKABOX 110 cannot be used for conveying inflammable or explosive liqu...

Страница 5: ...n valve on the pipe connecting to the public private sewer network or to other ducts Always refer to the local and or national regulations laws and standards in force Anyway it is recommended to insta...

Страница 6: ...so as to avoid rotation and floating For this you can use the slots on the base of the tank There must be a horizontal base suitable to bear the weight of the station during its operation Depending o...

Страница 7: ...ving drilled the required outlet see par 4 1 5 3 To guarantee a perfect seal it is recommended to use Teflon or suitable glues depending on whether the material being glued is plastic PP or PVC or met...

Страница 8: ...n the station Identify the seat for the duct on the bottom of the station open the duct and connect the emergency drainage pipe Check that the coupling is watertight 5 9 Non return valve Install a non...

Страница 9: ...stallation kit containing respectively the parts in figure 8 for installation of both the vertical and the horizontal outlet For the assembly of the kit see figure 8 1 Adapter 2 F 1 1 4M not necessary...

Страница 10: ...ENGLISH 31 FEKABOX 110 l PREPARED FOR THE FOLLOWING PUMPS FEKABOX 110 FEKA 600 MA FEKA VS VX 550 MA FEKA VS VX 750 MA Fig 9A FEKA 600 Fig 9 FEKA VS...

Страница 11: ...e electropump is primed Open the interception valve in the inlet pipe and check that the station is working correctly The flow of liquid coming from the various utilities must not prevent the correct...

Страница 12: ...loat moves freely If necessary remove the pump from the tank It is recommended to clean the system at least once a year with running water operating the pump repeatedly 10 TROUBLESHOOTING FAULTS CHECK...

Отзывы: