ENGLISH

 

27 

All the ducts must be installed in such a way  that they are not stressed. The ducts must not 
exert stress on the station. Check that the electropump is securely fixed to the pipes and that 
all the hydraulic connections are tightened and watertight. 

Where  necessary  provide suitable  means  for  avoiding  the  transmission  of  vibrations  and  for  protecting  the 
pipes against the formation of ice.  

5.1  Placing the tank inside the building 

The tank may be laid on the floor, under the ground or housed in a masonry pit. Fig.2, Fig.3 

In any case the surface on which it is laid must be perfectly horizontal and it must be ensured that 
the whole bottom of the tank is in contact with the surface. 

For Fekabox 110 the cover of the tank is trafficable 

(max. weight 100 Kg, see fig. 1). 

In  indoor  installations  (garage,  basement,  technical  room),  the  tank  must  be  fixed  to  the 
ground using the slots provided to prevent rotations, as indicated in figure 4. 

Leave  a  free  space  of  at  least  60  cm  around  and  above  the  station  for  installation  and 
maintenance. 

5.2  Placing the tank outside the building 

If the tank would not buried, to prevent damage to itself and to the seals, you should not expose it to heat 
sources such as direct sunlight can be at certain times of the year. 

Do not position the lifting station directly on the ground. The site chosen must not have ground 
water and must not be subject to flooding. Suitable anchor the station so as to avoid rotation 
and floating. For this you can use the slots on the base of the tank. 
There must be a horizontal base suitable to bear the weight of the station during its operation. 
Depending on the characteristics of the terrain it may be necessary to create walls with bricks, 
prefabricated  components  or  concrete.  Fill  the  space  between  the  ditch  and  the  station  with 
sand and compact it suitably. Protect the station suitably against frost.  

Do not drive vehicles over the cover (see fig. 3).  

You can close the ditch with a cover (manhole) or other means for facilitating subsequent maintenance. Put 
up  suitable  signals  indicating  the  presence  of  the  station  so  as  to  avoid  possible  damage  caused 
unintentionally. Ensure that there is sufficient space for installation and maintenance around and above the 
lifting station. 

Position  any  capacitor  holder  and/or  electric  control  panel  in  a  place  sheltered  from  the 
elements.  

After having completed the hydraulic and electric connection, it is recommended to place clean sand around 
the container to reduce any movements caused by the system and/or by the surrounding terrain. 

5.3  Making holes for the collection, delivery and ventilation pipes 

Choose the inlet duct already prepared for the inlet pipe so that the arrival of the liquid does not disturb the 
operation of the pump float. 
The Fekabox 110 tanks have multiple inlets, all marked with the symbol: 

Make a hole in the tank in the determined areas, indicated by the symbols shown above. 

Fig. 4 

FIX THE TANK TO THE GROUND 
BEFORE USE 

Use screws TE M8 with respective 
fixture, use specific washers for soft 
materials ISO 7093

Содержание FEKABOX 110 Series

Страница 1: ...AINTENANCE INSTALLATIONSANWEISUNG UND WARTUNG INSTRUCTIES VOOR INGEBRUIKNAME EN ONDERHOUD INSTRUCCIONES PARA LA INSTALACION Y EL MANTENIMIENTO N VOD K INSTALACI A DR B INSTRUKCJA MONTA U I KONSERWACJI...

Страница 2: ...for the collection delivery and ventilation pipes 27 5 4 Gluing the collection and ventilation pipes 28 5 5 Connecting the delivery pipe to the sewer network 28 5 6 Connecting the ventilation pipe 28...

Страница 3: ...e appliance by a person responsable for their safety Children should be supervised to ensure that they do not play with the appliance 1 3 Check that the system has suffered no damage during transport...

Страница 4: ...basement rooms situated below the level of the sewer network In compliance with the accident prevention regulations in force the FEKABOX 110 cannot be used for conveying inflammable or explosive liqu...

Страница 5: ...n valve on the pipe connecting to the public private sewer network or to other ducts Always refer to the local and or national regulations laws and standards in force Anyway it is recommended to insta...

Страница 6: ...so as to avoid rotation and floating For this you can use the slots on the base of the tank There must be a horizontal base suitable to bear the weight of the station during its operation Depending o...

Страница 7: ...ving drilled the required outlet see par 4 1 5 3 To guarantee a perfect seal it is recommended to use Teflon or suitable glues depending on whether the material being glued is plastic PP or PVC or met...

Страница 8: ...n the station Identify the seat for the duct on the bottom of the station open the duct and connect the emergency drainage pipe Check that the coupling is watertight 5 9 Non return valve Install a non...

Страница 9: ...stallation kit containing respectively the parts in figure 8 for installation of both the vertical and the horizontal outlet For the assembly of the kit see figure 8 1 Adapter 2 F 1 1 4M not necessary...

Страница 10: ...ENGLISH 31 FEKABOX 110 l PREPARED FOR THE FOLLOWING PUMPS FEKABOX 110 FEKA 600 MA FEKA VS VX 550 MA FEKA VS VX 750 MA Fig 9A FEKA 600 Fig 9 FEKA VS...

Страница 11: ...e electropump is primed Open the interception valve in the inlet pipe and check that the station is working correctly The flow of liquid coming from the various utilities must not prevent the correct...

Страница 12: ...loat moves freely If necessary remove the pump from the tank It is recommended to clean the system at least once a year with running water operating the pump repeatedly 10 TROUBLESHOOTING FAULTS CHECK...

Отзывы: