To make the hole use a hollow cutter as shown in figure 5 (indicative figure). 

5.4  Gluing the collection and ventilation pipes 

Before gluing the PVC pipe must be deburred and cleaned with a suitable solvent on the whole surface that 
will be in contact with the tank. 
To ensure that it sticks firmly, the glue must be applied on the whole newly deburred surface, at least for a 
complete round. 

Attention: 

Use  glue  suitable  for  sticking  PVC  materials  with  PE.  Also  check  the  drying  times 

indicated in the specific instructions for the glue used. 
For the discharge pipe 2”PP (Fekabox 110) use the multifibre nylon sealant Loctite 55, the polymerising GEI 
sealant Loctite 5331 or Teflon. For the steel pipe znb 2” and the other inlet connections use the most suitable 
glue in accordance with the standards of the local market. 

5.5  Connecting the delivery pipe to the sewer network 

Fekabox 110 tanks have a 2” GAS outlet connection. It must be fitted as shown in figure 6 after having drilled 
the required outlet (see par. 4.1 / 5.3). 
To  guarantee  a  perfect  seal  it  is  recommended  to  use  Teflon  or  suitable  glues  depending  on  whether  the 
material being glued is plastic (PP or PVC) or metal. 

5.6  Connecting the ventilation pipe 

Remember to provide a ventilation pipe to avoid the formation of inflammable, explosive or toxic mixtures. 

On the station identify the seat for the ventilation duct, marked with the symbol 

. Open the duct as 

indicated  in  point  5.3  and  connect  the  ventilation  pipe  so  that  it  can  evacuate  any  condensate  from  the 
station. Check that the coupling is watertight.  
The  various  national  regulations  may  require  different  ratios  between  the  diameter  of  the  outlet  pipe  and 
that of the ventilation pipe. Ensure that the pipe outlet is in the open (for example, above the ridge of the 
roof if the station is installed inside a building) and that the exhaust gases cannot get into other places such 
as buildings, rooms and similar. Avoid horizontal stretches in the ventilation duct. 

Tank model 

Inlet
diameter 

Ventilation 
diameter 

Cutter
diameter 

Emergency 
diameter 

Fekabox 110 

DN50 

DN50 

DN 44 

DN 40 

DN110 

DN100 

Fig. 5 

Fig. 6 

Gasket 

Ring nut 

Through-hull 

Содержание FEKABOX 110 Series

Страница 1: ...AINTENANCE INSTALLATIONSANWEISUNG UND WARTUNG INSTRUCTIES VOOR INGEBRUIKNAME EN ONDERHOUD INSTRUCCIONES PARA LA INSTALACION Y EL MANTENIMIENTO N VOD K INSTALACI A DR B INSTRUKCJA MONTA U I KONSERWACJI...

Страница 2: ...for the collection delivery and ventilation pipes 27 5 4 Gluing the collection and ventilation pipes 28 5 5 Connecting the delivery pipe to the sewer network 28 5 6 Connecting the ventilation pipe 28...

Страница 3: ...e appliance by a person responsable for their safety Children should be supervised to ensure that they do not play with the appliance 1 3 Check that the system has suffered no damage during transport...

Страница 4: ...basement rooms situated below the level of the sewer network In compliance with the accident prevention regulations in force the FEKABOX 110 cannot be used for conveying inflammable or explosive liqu...

Страница 5: ...n valve on the pipe connecting to the public private sewer network or to other ducts Always refer to the local and or national regulations laws and standards in force Anyway it is recommended to insta...

Страница 6: ...so as to avoid rotation and floating For this you can use the slots on the base of the tank There must be a horizontal base suitable to bear the weight of the station during its operation Depending o...

Страница 7: ...ving drilled the required outlet see par 4 1 5 3 To guarantee a perfect seal it is recommended to use Teflon or suitable glues depending on whether the material being glued is plastic PP or PVC or met...

Страница 8: ...n the station Identify the seat for the duct on the bottom of the station open the duct and connect the emergency drainage pipe Check that the coupling is watertight 5 9 Non return valve Install a non...

Страница 9: ...stallation kit containing respectively the parts in figure 8 for installation of both the vertical and the horizontal outlet For the assembly of the kit see figure 8 1 Adapter 2 F 1 1 4M not necessary...

Страница 10: ...ENGLISH 31 FEKABOX 110 l PREPARED FOR THE FOLLOWING PUMPS FEKABOX 110 FEKA 600 MA FEKA VS VX 550 MA FEKA VS VX 750 MA Fig 9A FEKA 600 Fig 9 FEKA VS...

Страница 11: ...e electropump is primed Open the interception valve in the inlet pipe and check that the station is working correctly The flow of liquid coming from the various utilities must not prevent the correct...

Страница 12: ...loat moves freely If necessary remove the pump from the tank It is recommended to clean the system at least once a year with running water operating the pump repeatedly 10 TROUBLESHOOTING FAULTS CHECK...

Отзывы: