4
Electrical Wiring - Models 10M, 15M
1. Install electrical hook up that applies to your unit. Make sure to
review your Electrical Installation Checklist and wiring diagram
(see Figure 3) for 120-volt switch, 220/240-volt switch, or DRC
low voltage control.
NOTE: Da-Lift projector lift has been internally wired at
Da-Lite. External wiring is completed by installer conforming
to local and national codes. Be sure the wires are long
enough for the Da-Lift to go up and down.
2. Test installation by carefully running Da-Lift
“up”
and
“down”
several times. Be prepared to stop the Da-Lift. Duty cycle is three
(3) minutes ON and three (3) minutes OFF.
3. Make sure Da-Lift stops in the up direction flush with the ceiling.
Da-lite offers two styles of 240-volt wall switches for standard operation.
Please see wiring diagram included in wall switch box included with screen.
120V Wiring Diagram
240 Volt Wiring Diagram
Up Limit
Switch N.C.
Opens When
Operated
Operating Switch,
Switch Box, And
Plate Furnished With
Da-Lift. (SPDT With
Center Off)
Black (Hot)
White (Common)
120V.
Plug-In For T.V.
This Switch Cannot
Be Used With L.V.C.
Side View Of
Switch & Box
Junction
Box
Black (Down)
Red (Up)
Black & Yellow
Black
Re
d
Black
Re
d
Black (Do
wn)
Black
Black
R
ed (Up)
Whit
e
Whit
e
Whit
e (Common)
White (Common)
120V.
Black (Hot)
AC Common
AC Hot
120V. AC 60Hz.
2.2 AMP. Max
Up
Down
Off
Figure 3