background image

3

Suggested Methods Of Installation

1.  Mounting Da-Lift Projector Lift between joists.

 

Install the joists at the proper height and width to fit the Da-Lift 
you are installing. See Figure 1.

 

NOTE: The Da-Lift must be installed on top of the joists.  
Be sure to leave access from above for installation.

 

When the joists are properly installed, and secured in place, slide 
the Da-Lift in position. Bolt the two brackets (1-1/2” x 19”) to the 
frame. Lower the unit onto the joists and secure in place. 
Additional bracing may be required, based on construction.

 

NOTE: Da-Lift projector lift must be installed level!

2.  Mounting Da-Lift Projector Lift using 1/2” diameter threaded rods.

Secure four 1/2” diameter threaded rods to the ceiling at the 
dimensions shown. See Figure 2, “E” and “F”. Install the mounting 
bracket (1-1/2” x 19”) to each side of Da-Lift with 1/2” diameter bolts, 
flat washers and nuts. Attach one nut on each rod and run the 
nut up to the desired height.

 

Slide Da-Lift projector lift up with all (4) four threaded rods into 
the mounting brackets. Install 1/2” nuts under the mounting 
brackets. Adjust the frame to the proper height and level with 
bottom nuts on the rod. Lock the mounting brackets in place 
with the nuts on the top of each rod. Frame must be level and 
solid. Additional bracing may be required, based on construction.

Model

Lifting  

Capacity

Width 

A

Height 

B

Depth 

C

Height 

D

DIm. 

E

Dim. 

F

Da-Lift 10M

40 lbs.

22-5/8”

15”

22”

4-1/2”

24-1/8”

14”

Da-Lift 15M

40 lbs.

22-5/8”

20”

22”

9-1/2”

24-1/8”

14”

Da-Lift 15

300 lbs.

30-3/4”

20”

34”

9-1/2”

32-1/4”

16-1/4”

Da-Lift 19

300 lbs.

32-3/4”

24”

38”

13-1/2”

34-1/4”

16-1/4”

  Da-Lift 19L

300 lbs.

42-3/4”

24”

48”

13-1/2”

44-1/4”

16-1/4”

Figure 1

Figure 2

A

C

B

D

E

F

Содержание Da-Lift 10M

Страница 1: ...INSTRUCTION BOOK FOR Da Lift Projector Lift 10M 15M 15 19 19L ...

Страница 2: ...This unit must be installed in accordance with the requirements of the Local Building Codes the Canadian Electrical Code CEC CAN CSA C22 1 and the National Electric Code NEC NFPA 70 1 Carefully unpack Da Lift projector lift 2 Make sure to recheck measurements of projector lift location before installation Original Instructions Disclaimer Milestone and its affiliated corporations and subsidiaries c...

Страница 3: ... shown See Figure 2 E and F Install the mounting bracket 1 1 2 x 19 to each side of Da Lift with 1 2 diameter bolts flat washers and nuts Attach one nut on each rod and run the nut up to the desired height Slide Da Lift projector lift up with all 4 four threaded rods into the mounting brackets Install 1 2 nuts under the mounting brackets Adjust the frame to the proper height and level with bottom ...

Страница 4: ...a Lift Duty cycle is three 3 minutes ON and three 3 minutes OFF 3 Make sure Da Lift stops in the up direction flush with the ceiling Da lite offers two styles of 240 volt wall switches for standard operation Please see wiring diagram included in wall switch box included with screen 120V Wiring Diagram 240 Volt Wiring Diagram Up Limit Switch N C Opens When Operated Operating Switch Switch Box And P...

Страница 5: ...ift Duty cycle is three 3 minutes ON and three 3 minutes OFF 3 Make sure Da Lift stops in the up direction flush with the ceiling Da lite offers two styles of 240 volt wall switches for standard operation Please see wiring diagram included in wall switch box included with screen 120V Wiring Diagram 240 Volt Wiring Diagram Up Limit Switch N C Opens When Operated Operating Switch Switch Box And Plat...

Страница 6: ...ft and check for proper stopping height If additional change is necessary repeat steps until the proper height is set Check for satisfactory condition by operating unit a few times The bottom frame of the Da Lift is removable and adjustable to ceiling level Finish the bottom frame to match the ceiling Models 10M 15M Use a small screwdriver or 5 32 hex wrench and insert in number 2 switch Turn coun...

Страница 7: ... Tile Plate by attaching a ceiling tile to it painting it or other finishing ideas See Figure 7 Use the adjustable Bottom Frame to position the Ceiling Tile Plate level with the ceiling Figure 6 Figure 7 Mount Channel Screws Holding Frame Coupling Plate Frame Can Adjust Vertically Screw Holding Ceiling Tile Plate Ceiling Tile Plate Can Adjust Set Screws 3 8 Screws Washers And Nuts ...

Страница 8: ...ties of fitness for use or merchantability that may be mandated by statute or rule of law are limited to the five 5 year warranty period This warranty gives you specific legal rights and you may also have other rights which vary from state to state TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW NO LIABILITY IS ASSUMED FOR EXPENSES OR DAMAGES RESULTING FROM INTERRUPTION IN OPERATION OF EQUIPMENT...

Отзывы: