6
UNPACKING AND INSTALLATION
This chapter provides unpacking and installation information for the Switch.
Unpacking
Open the shipping cartons of the Switch and carefully unpacks its contents.
The carton should contain the following items:
One DGS-1248T Web Smart 48-Port 10/100/1000Mbps Gigabit
Switch
One AC power cord, suitable for your area’s electrical power
connections
Four rubber feet to be used for shock cushioning
Screws and two mounting brackets
CD-ROM with Web Management Utility and Manual
If any item is found missing or damaged, please contact your local reseller for
replacement.
Installation
The site where you install the hub stack may greatly affect its performance.
When installing, consider the following pointers:
Install the Switch in a fairly cool and dry place. See
Technical Specifications
for the acceptable temperature and humidity operating ranges.
Install the Switch in a site free from strong electromagnetic field generators
(such as motors), vibration, dust, and direct exposure to sunlight.
Leave at least 10cm of space at the front and rear of the hub for ventilation.
Install the Switch on a sturdy, level surface that can support its weight, or in an
EIA standard-size equipment rack. For information on rack installation, see the
next section, Rack Mounting
.
Содержание DGS-1248T - Switch
Страница 34: ...Figure 24 Statistics For detailed packet information click on the ID parameter as in Figure 25 29 ...
Страница 35: ...Figure 25 30 ...
Страница 39: ...Figure 31 Logout 34 ...
Страница 60: ...55 ...