D-Link DGS-1100 MP/MPP Series Switch User Manual
15
Step 5: Attach the terminal lug ring at the other end of the grounding cable to an appropriate
grounding stud or bolt on rack where the switch is installed.
Step 6: Verify if the connections at the ground connector on the switch and the rack are securely
attached.
Figure 3-5 – Ground cable, screw and #8 terminal lug rings
CAUTION:
This equipment is to be connected only to PoE networks without
routing to the outside plant.
Содержание DGS-1100-10MP
Страница 1: ...1 ...
Страница 56: ...D Link DGS 1100 MP MPP Series Switch User Manual 52 Figure 15 8 Reboot System Rebooting window ...
Страница 62: ...D Link DGS 1100 Series Switch User Manual ...