The angles that can be seen in the example
are 0.8º between the first and second boxes, and 1.6º
between the second and the third boxes. The cluster
can now be lifted by the two motors, and the PL-48S
platform detached.
The first step to detach the PL-48S platform
from the bottom box is to release (6) the safety pins
which secure the PL-48S_1 piece to the platform and
the PL-48S_2 piece to the box. After raising the
cluster a bit, the safety pins which connect the PL-
48S_1 piece to the box can be released (8) also. PL-
48S_1 piece should now be reattached again to the
platform.
Now that the first three units have been
rigged, the entire cluster should be lifted up so there is
room enough to roll another stack under the cluster.
71
Aero-38
Manual del usuario/
User´s manual
3
3
4
4
4
0.8º
1.6º
5
5
0.8º
5
Select the angle between cabinets
introducing (5) the pins in the holes of the rigging
system through the slot of G2A48.
6
6
PL-48S_2
PL-48S_1
7
8
Содержание AERO-182
Страница 1: ...Manual del Usuario User s Guide AERO 38 series ...
Страница 20: ...Manual del usuario User s manual 60 Aero 38 ...