Once the first box has been placed at 0º and
raised approximately 75cm (30 in) the second box of
the array can be rolled into place. Once located in
position, the G2A48 guides of the second box should
be freed and inserted in the rear located receiving
points of the suspended box and secured with the
safety pins.
Swing the G2A48 guide
into place and secure it
with the safety pin.
Once the splay angle between the first two
boxes has been determined, the front of the box can
be lifted into place. Three people will be needed to
undertake this operation, two to lift the box and one to
fit the G1A48 guide and safety pins into the upper box.
57
Aero-38
Manual del usuario/
User´s manual
Lifted by way of the rear hoist
until the wheels of the PL-38
dolly platform are off the ground.
Lift with the front hoist
until the box is in a
horizontal position.
0º
Lift the box and free
the G1A48 guides.
Содержание AERO-182
Страница 1: ...Manual del Usuario User s Guide AERO 38 series ...
Страница 20: ...Manual del usuario User s manual 60 Aero 38 ...