IMPORTANT SAFETY INSTRUCTIONS

 

 

 

Save These Instructions! This manual contains important constructions that shall be followed during the installation and maintenance of the CyberPower Grid 

Tie Solar Inverter. 

 

CAUTION!   

Before  installation  and  using  the  Inverter,  read  all 

instructions  and  cautionary  markings  on  the  inverter  and  appropriate 
sections of this guide.

 

CAUTION!   

To reduce risk of fire hazard, do not cover or obstruct the 

heat sink.

 

CAUTION!   

Observe the clearance recommendations. Do not install the 

Inverter in a zero-clearance or non-ventilated compartment. Overheating 
may result.

 

CAUTION!   

Use  only  accessories  recommended  or  sold  by  the 

manufacturer. Doing otherwise may result in a risk of fire, electric shock, 
or injury to persons.

 

CAUTION!

    To  avoid  a  risk  of  fire  and  electric  shock,  make  sure  that 

existing wiring is in good condition and that wire is not undersized. Do not 
operate the Inverter with damaged or substandard wiring.

 

CAUTION!   

Do not operate the Inverter if it has received a sharp blow, 

been dropped, or otherwise damaged in any way.

 

CAUTION! 

Do  not  disassemble  the  Inverter.  It  contains  no 

user-serviceable  parts.  Attempting  to  service  the  Inverter  yourself  may 
result in a risk of electrical shock or fire and will void the factory warranty.

 

CAUTION!   

To reduce the risk of electrical shock, disconnect both AC 

and DC power from the Inverter before attempting any, maintenance or 
cleaning or working on any circuits connected to the inverter. Turning off 
controls will not reduce this risk. Internal capacitors remain charger for 5 
minutes after disconnecting all source of power.

 

CAUTION!   

The Inverter must be connected to an equipment-grounding 

conductor directly or via the AC ground. 

ATTENTIO: 

  Risk  of  burning:  During  operation  the  case  temperature 

may exceed 140

(60

) , do not touch. 

HIGH VOLTAGE:   

Before opening the device, disconnect from the grid 

and the PV generator. The device may only be opened by an electrician. 

 

The following conventions are used in this guide. 

  WARNING!

    Warnings  identify  conditions  that  could  result  in 

personal injury or loss of life. 

  CAUTION!   

Cautions identify conditions or practices that could 

result in damage to the unit or other equipment.

 

IMPORTANT:

 These notes describe things which are important for you to 

know, but not as serious as a caution or warning. 

 

 

 

 

About This Manual 

This  purpose  of  this  Installation  &  Operation  Manual  is  to  provide 
explanations  and  procedures  for  installing,  operating,  maintaining,  and 
troubleshooting the CyperPower Grid Tie Solar Inverter. 

Scope

 

This  manual  provides  safety  guidelines,  detailed  planning  and  setup 
information.  It  provides  procedures  for  installing  the  inverter  and 
information  about  operating  and  troubleshooting  the  unit.  It  dose  not 
provide details about particular brands of photovoltaic (PV) panels. You 
need to consult individual PV manufacturers for this information. 

Audience

 

This manual is intended for anyone who needs to install and operate the 
inverter.  Installers  should  be  fully  educated  on  the  hazards  of  installing 
electrical  equipment.  Certified  electricians  or  technicians  are 
recommended. 

 

 

Abbreviation and Acronyms 

AC: 

Alternating Current 

DC: 

Direct Current 

LCD: 

Liquid Crystal Display 

LED: 

Light Emitting Diode 

MPPT: 

Maximum Power Point Tracking 

PC: 

Personal Computer 

PV: 

Photovoltaic   

PWM: 

Pulse Width Modulation 

Vac: 

Volts AC 

Vdc: 

Volts DC 

V

MP

Voltage at Maximum power 

V

OC

Open Circuit Voltage

 

!

 

!

Содержание CPSPV4000ETL

Страница 1: ...User s Manual CPSPV5000ETL CPSPV4000ETL CyberPower Systems Inc www cpsww com...

Страница 2: ...g all source of power CAUTION The Inverter must be connected to an equipment grounding conductor directly or via the AC ground ATTENTIO Risk of burning During operation the case temperature may exceed...

Страница 3: ...Copyright 2012 CyberPower Systems Inc UNPACKING 2 1 CPSPV5000ETL or CPSPV4000ETL module 2 Stainless wall mount bracket 3 User s manual 4 Warranty card 5 Self tapping screws M6 30L 5...

Страница 4: ...ts Routing the wires Ensure that you have obtained all permits required by local authorities or utilities before commencing installation Inverter Location WARNING Burn hazard Do not install in a locat...

Страница 5: ...cts of array voltages outside of the MPPT operational window are shown in below Table Voltage Vdc Effect of Array Voltage Inverter Mode 250 Will shut down Shutdown 250 310 Maximum harvest of solar ene...

Страница 6: ...e wires Preparing for the Installation Ensure your local utility is consulted for any requirements for connecting to or returning power to the grid Obtain all permits necessary to complete the install...

Страница 7: ...tached screws Self tapping screws M6 20L 5pcs Step2 Put the inverter on the wall mount bracket Step3 Make sure the host of inverter on the incision of the wall mount bracket Step4 Move the inverter fr...

Страница 8: ...e LED indicator lights providing status ground fault and other warning indication Front Panel Feature 1 LCD Graphic liquid crystal display 160 128 dots 2 Button A Up key select the display item B Down...

Страница 9: ...Recommended type PV KST4 2 5I with 1 5 2 5mm 2 cable double isolation 3 Solar input positive DC wires connect to solar array positive Recommended type PV KBT4 2 5I with 1 5 2 5mm 2 cable double isolat...

Страница 10: ...ration and periodically through its life as required by the utilities This test ensures that inverter dose not send electricity to the utility grid when local utility has shut off the grid for repairs...

Страница 11: ...y 14 59 24 After you select above three items the display will enter into Home Page 1 Home page 5 4 3 2 2 788 1 Pac kW k W 6 12 18 24 E T o t a l 9 2 4 9 9 k W h 1 9 8 7 k W h E D a y 1 3 0 1 2 0 1 2...

Страница 12: ...2 2 Multi meter In Main Menu select Data Logger then press Enter key 2 3 Data Logger Data Logger Daily Log Monthly Log Yearly Log In Data Logger select Daily Log then press Enter key 2 3 1 Daily Log k...

Страница 13: ...0 1 2 0 1 2 1 1 0 5 1 G r i d Q u a l i t y 2 5 1 1 2 0 1 1 0 8 1 2 1 A C V o l t L o w IMPORTANT There are over last 100 dated failure reports on the NS protection can be read In Main Menu select Co...

Страница 14: ...C P L 0 5 K 0 1 0 0 0 1 1 3 Device Info Firmware C Firmware M 3 Runtime Hour V 0 0 1 7 Firmware R V 0 0 5 1 V 0 0 2 5 2 3 Device Info 0 0 1 RS485ID 3 3 In Config select Installer Code then press Ente...

Страница 15: ...or 1 failure F08 Temperature sensor 2 high F09 Hardware temperature sensor 2 failure F10 Temperature sensor 3 high F11 Hardware temperature sensor 3 failure F15 Hardware main DSP ADC1 failure F16 Hard...

Страница 16: ...000 Watt For VDE AR N 4105 4600 Watt Grid Single phase Grid rating voltage 230 Vac Grid voltage range Over under voltage disconnect 180 270 Vac According to code setting table Over under voltage disco...

Страница 17: ...power Firmware revision Inverter ID RTC Real time counter 10 years life Data storage Accumulate historical energy Regulatory Safety IEC 62109 1 2 Grid interface VDE AR N 4105 VDE0126 1 1 A1 UTE C 15...

Страница 18: ...gerous electrical voltage Energy storage timed discharge with 1 minutes Beware of hot surface Observe enclosed documentation There are special requirements The inverter complies with the requirements...

Страница 19: ...tage low ON Fast 197 8 189 189 192 Frequency high OFF Hz 51 50 0 08 sec 50 2 0 2 sec 50 2 0 2 sec 60 3 0 2 sec Frequency high ON Hz 50 05 50 15 50 15 60 1 Frequency low OFF Hz 47 50 0 08 sec 47 5 0 2...

Страница 20: ...opyright 2012 CyberPower Systems Inc Code setting table 19 Reactive power measurement 1 00 0 98 0 98 0 96 0 94 0 92 0 90 0 96 0 94 0 92 0 90 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 1 0 P Pemax Cos ind cap...