INSTALLATION INSTRUCTIONS
II9
Front
panel
&RQ¿JXUDWLRQYDULHV
ZLWKPRGHO
7HUPLQDO
block
&RQ¿JXUDWLRQYDULHV
ZLWKPRGHO
or
Installation
Leveling
1 Position the brewer on the counter top. Level it left to
right and front to back by turning the bottom of the
legs.
Connect the Water Supply
2 Flush the water supply line prior to installation to purge
BJSBOEEFCSJTGSPNUIFXBUFSmMUFSBOEUVCJOH
3
$POOFDUUIFXBUFSTVQQMZMJOFUPUIFnBSFmUUJOHPO
the back of the brewer. Leave the water supply valve
closed until the power is connected.
WARNING:
Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than necessary.
(5)&3.0130*/45"--"5*0/*/4536$5*0/4ø
082019C
WARNING:
Do not connect the power cord to the
power supply until instructed to do so.
Setting Up 120/220 Volt Units for 220-240 Volt Operation
4 Remove the front panel.
5 Loosen the strain relief on the back of the brewer.
6 Disconnect the existing power cable from the terminal
block and remove.
7 Feed the 220-240 Volt power cable through the strain
relief, into the brewer. The brewer may be wired for
connection directly to a junction box or for use with a
power plug that connects to an electrical outlet meeting
the brewer
SPECIFICATIONS
.
8 Disconnect and cap the jumper wire between the “C”
and “N” terminals on the terminal block.
9 Connect the wires on the power cable to the terminal
block inside the brewer according to the
ELECTRICAL
SCHEMATIC
.
10 Tighten the strain relief and replace the front panel.