Installation
Leveling
1 Position the brewer on the countertop. Level it left to
right and front to back by turning the bottom of the
legs.
Connect the Water Supply
2 Flush the water supply line prior to installation to
QVSHFBJSBOEEFCSJTGSPNUIFXBUFSmMUFSBOEUVCJOH
3
$POOFDUUIFXBUFSTVQQMZMJOFUPUIFnBSFmUUJOHPO
the back of the brewer. Leave the water supply valve
closed until the hot water faucet is installed and power
is connected.
Install the Hot Water Faucet
4 Remove the screws that hold the front cover in place
and remove the cover.
5 Carefully remove the round plug from the faucet hole
on the left or right side panel depending on the desire
faucet mounting location.
INSTALLATION INSTRUCTIONS
II10
HIGH VOLUME COMBO BREWERS, INSTALLATION INSTRUCTIONS
082316NC
WARNING:
Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than necessary.
High volume combo brewers have a water tank
DPOmHVSFEGPSJOTUBMMBUJPOPGBOPQUJPOBMIPUXBUFS
faucet. The faucet ships loose with the brewer so
that the customer can decide if they want it
installed. If you are NOT installing the hot water
faucet AND the brewer being installed will be
connected to 120 Volts, skip to step 20.
Plug
Front
panel
Side
panel
6 Locate the faucet and insert the shaft into the faucet
hole.
7 From inside the brewer slide the lock washer over the
faucet shank. Then, thread the nut onto the faucet
shank.
8 Hold the body of the faucet while tightening the nut
with a 3/4” socket.